Household outbuildings: maximum size and papers

In a village and on conditions, outbuildings totalling up to 20 sq m without foundations need no permit, and up to 50 sq m in total go by notificare.

Citește în română

The shed at the end of the yard, the garage, the summer kitchen: for Legea 169/2026 they are all household outbuildings, and owners want to know how big they can be without a permit. The Code does not answer with one figure and has no maximum size for a household outbuilding as such. It has thresholds, at 20, 50 and 150 sq m, and each changes something different: whether you file anything with the council, what you file, or whether an outbuilding put up without papers can still be put right. The first two exist only in villages.

Romanian terms are kept in the original: an anexă gospodărească is a household outbuilding, and the notificare is the simplified procedure that replaces the building permit for a short list of works.

What a household outbuilding is, for the law

Annex 1 of the Code, the one with the definitions, describes it as a permanent or temporary structure in the yard of an individual household that serves activities specific and complementary to living there. The examples given, typically in villages, are summer kitchens, stables for large animals, corn cribs, sheds, storage buildings, garages, greenhouses, polytunnels and swimming pools.

The same annex separately defines the outbuildings of farm holdings: temporary single-storey structures of at most 200 sq m, used by farm workers in isolated areas outside the built-up boundary (extravilan). They are not the shed in your yard, and the rules for the extravilan are in intravilan or extravilan land.

The thresholds, one by one

What you buildWhat you fileWhere it is
New outbuildings next to a house, of at most 20 sq m combined, at most 2.5 m high, without foundations, temporary and demountable, on a timber or metal frame, in a rural areaNo permit and no notification; the outbuilding is declared for taxart. 299 para. (2) let. c), para. (12)
New outbuildings next to a house, of at most 50 sq m combined, including those under 20 sq m with foundations, permanent, inside the built-up area of a rural locality outside metropolitan areas, with approved planning documents, outside protected zones and monument protection zonesNotificationart. 294 para. (2) let. a) pt. (i)
An outbuilding in a town, one over 50 sq m, one over 20 sq m in the extravilan or in a commune inside a metropolitan area, or one in a protected zone (for those under 20 sq m, see below)Building permitart. 245 para. (1)-(2), art. 246 para. (1)
An outbuilding put up without papers, of at most 150 sq m gross floor areaYou can apply for a regularisation permitart. 301 para. (2)

Both exceptions concern structures outside single-family homes: on a plot with no house, neither applies. The full list of works that need no permit, with the conditions for each, is on the page about works without a permit. Here we stop at what the table does not show.

Combined means it adds up

Both small thresholds are written as areas that do not exceed, combined, 20 and 50 sq m respectively. A 12 sq m shed and a 12 sq m summer kitchen make 24 sq m and fall outside the 20 sq m threshold, even though each one alone would have fitted. The text speaks of new structures and does not say whether the old outbuildings already in the yard, put up years ago, count too. If you already have a few, ask the council before you rely on the threshold.

The second trap is the foundation. The 20 sq m threshold requires structures without foundations that can be taken apart. A slab poured under the shed takes you out of it and, at most, onto the notification, where letter a) point (i) expressly names outbuildings under 20 sq m built with foundations, permanent, not demountable.

Even the no-formality threshold has rules. Letter c) requires compliance with the general urban plan, the local planning regulation and the Civil Code, so also with the distances to the neighbour explained in how close to a neighbour you can build. And paragraph (12) of the same article requires the outbuilding to be declared, on your own responsibility, and taxed under the Fiscal Code. Whether the outbuilding counts towards the plot ratios is on the page about POT, CUT and UTR.

Why it matters that you are in a village

Both small thresholds are for rural areas. The notification also requires the built-up area, approved planning documents and a plot outside protected zones and monument protection zones, and it excludes rural localities inside metropolitan areas. The 20 sq m threshold says only built in a rural area. It does not repeat the protected-zone exclusion, but that does not make it a permission there: article 190 paragraph (1) requires, for interventions on properties in protected zones, the prior approval it sets out, from the Ministry of Culture or the environmental authority, and paragraph (3) of article 299 keeps the law on the natural and built heritage binding. In a protected zone, ask before you put anything up.

The same 18 sq m shed, timber, without foundations, demountable and under 2.5 m, needs neither a permit nor a notification in a village commune, only the tax declaration, and needs a building permit in a town. The urban exception is narrow: pergolas and demountable outdoor terraces inside the property, outside protected built-up zones, need no formality in towns too (article 299 paragraph (2) letter b) point 4). A garage or a shed is not on that list. Retaining walls and ground-floor access steps are on the same list, and I read them in retaining wall and access steps.

150 sq m does not mean building without a permit

The figure of 150 sq m circulates under headlines about houses and outbuildings without a permit. In the Code it appears in two places that concern outbuildings and houses, and in neither does it exempt you from papers.

The first is a single house, not an outbuilding: article 294 paragraph (2) letter a) point (ii) allows on a notification one house of at most 150 sq m gross floor area, ground floor or semi-basement and ground floor, with no basement, inside the built-up area of a rural locality, but only on a standard design made available by the authorities or on an individual design by a team of architects and engineers, approved by the county chief architect. For that house, the geotechnical and topographical surveys are mandatory (article 298 paragraph (3)).

The second is regularisation: article 301 paragraph (2) allows it for household outbuildings of at most 150 sq m gross floor area built without a permit. The conditions in paragraph (3) are cumulative, and paragraph (9) requires technical expert reports on the essential requirements. If they are not met, paragraph (5) leads to demolition. Above 150 sq m, regularisation is possible only in the one-year window of paragraph (7), with tenfold levies and fees (paragraph (8)), explained in the one-year window for regularisation. In a protected zone, access to regularisation is uncertain: paragraph (2) ties the exclusion of those zones to houses, and the text does not say clearly whether it also covers outbuildings. The procedure is on the page about the regularisation permit.

Building without the required permit is fined 50,000 to 1,000,000 lei, and without the required notification 5,000 to 50,000 lei (article 357 paragraph (1) letters a) and b), paragraph (4) letters a) and b)). In a monument’s protection zone and in protected built-up zones, building without a permit is a criminal offence (article 356 paragraph (1) letter a)).

When you do need a permit, the file is lighter

For an outbuilding, a few usual items drop out of the file. It is not a privilege of outbuildings: a ground-floor or two-storey house gets broadly the same exemptions (articles 267 and 268 paragraph (2) letter a), annex 6). They are still worth knowing before you pay for them:

What drops outConditionWhere it is
The public health approvalUnless the law requires a health impact studyart. 267 para. (2) let. b)
The environmental authority’s actExcept outbuildings used for raising animalsart. 268 para. (2) let. b)
Technical checking of the designThe design is in consequence class CC1; annex 6 gives as examples individual garages and farm buildings with limited access, such as storage buildings and stablesart. 440 para. (3), annex 6
The main contractorGarages, terraces and single-storey household outbuildings may be built by the owner directly (în regie proprie)art. 279 para. (1)

Who sets the consequence class and what it means for checking we wrote in the consequence class. What self-build means at handover, in signing off a house you built yourself.

The papers afterwards

An outbuilding on a notification is built without technical checking of the design, with the liability on the designers (article 298 paragraph (2)). The handover is done with a representative of the local administrative unit, and the report goes into the National Register of Constructions or, until it works, to the I.S.C. (paragraph (6)). Registration in the land book is based on proof of the notification and on checking the entry in the register (paragraph (7)); the remaining steps are in registering a newly built house.

Even the outbuilding under 20 sq m does not escape the paperwork. Article 299 paragraph (5) requires a handover for works carried out with no formality too, concluded under the contract with the builder, and records it, together with the detailed design, in the building’s technical book and in the National Register of Constructions. Paragraph (12) adds the declaration on your own responsibility for tax, and says that, being temporary structures, these outbuildings are removed from the council’s records on the owner’s declaration as well.

And if in a few years you want to pull down an outbuilding built on a notification or with a permit, demolishing household outbuildings outside protected built-up zones also goes on a notification (article 302 paragraph (5)).


This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Check your own situation with the issuing authority.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.