Building permit fee calculator
Estimate the permit fee from the value of the works and see which other fees the dossier involves, with the deadlines that go with them.
Obtaining a building permit involves several distinct fees, from the urban planning certificate to the avize and the permit itself. The calculator below estimates the permit fee using the percentages set by the Fiscal Code. The other fees are set by the primărie and by the issuing institutions, so we explain them without inventing amounts.
Indicative permit fee calculator
Enter the value of the works and pick the construction type. The calculation applies the percentages set by the Fiscal Code, art. 474.
- Estimated permit fee
- —
- Extension, if needed (30%)
- —
The result is indicative and applies to the authorised value of the works. The urbanism certificate fee and the aviz fees are paid separately and are set by the town hall through a local council decision. When the works are completed the fee is regularised against the real value, and any difference is settled within the deadlines set by law. For the exact amount, check with the issuing town hall.
Which fees are involved
The process usually involves the fee for the urban planning certificate, the fees for the avize requested through the certificate, and the fee for the building permit itself. Depending on the project, other fees required by issuing institutions may apply. The amount of each fee is set by the competent authority, in line with the legislation and local council decisions.
How the permit fee is calculated
The fee for issuing the building permit, the regularisation fee or the demolition permit fee is calculated under the Fiscal Code (Legea 227/2015), and the architecture stamp duty under Legea 35/1994. These acts were not amended by the Codul urbanismului, so the percentages remain the same. The concrete way it is applied is set by the primărie, which is why the final amount differs from one locality to another and from one project to another.
Aviz fees and deadlines
Aviz fees and issuing deadlines are set separately by each issuing institution and by the primărie. The number and type of avize depend on what the urban planning certificate requires for your project, so the list of applicable fees and deadlines can vary. That is why it helps to have the official fees and deadlines relevant to your case in one place.
Why the amounts differ
There is no single amount that applies to all projects. The fees depend on the type of works, the declared value, the avize required, and the decisions of local authorities. AutoRize does not replace your authorized architect or proiectant, but it helps you see clearly which fees and official deadlines are relevant to your project.
Exemptions and additional fees
- Amending a permit does not incur a new authorisation fee; it is regularised before the reception at the completion of works.
- Exempt from authorisation fees: emergency first-intervention works to secure buildings that pose a public danger, regardless of use, as well as works on places of worship or on listed historic monuments (or monuments being classified), regardless of owner, except where commercial activities take place there.
- Extending the execution period incurs a fee of 30% of the initial fee.
- For issuing the permit under the emergency procedure (7 working days), the town hall may charge a special fee.
- Local councils may set a local land-development fee, intended to fund the public infrastructure required for urban development.
All the fees, in one place
The table below gathers the authorisation fees in one place, with the legal basis for each. The half-price fee for works carried out through simplified notification is a new provision of the Codul urbanismului, with direct impact for loft conversions, rural garages, or new fences built to replace an existing one.
- Extending the certificat de urbanism: 30% of the initial certificate fee (the Fiscal Code art. 474 para. 3).
- Extending the execution period: 30% of the initial fee (the Codul urbanismului art. 310 para. 5).
- Works through simplified notification: half of the corresponding authorisation fee (the Codul urbanismului art. 313 para. 4).
- Certificat de urbanism in a rural area: 50% of the urban fee (the Fiscal Code art. 474 para. 2).
- Building permit, residential building or annex: 0.5% of the authorised value of the works (the Fiscal Code art. 474 para. 5).
- Building permit, other constructions: 1% of the authorised value, including installations (the Fiscal Code art. 474 para. 6).
- Demolition permit: 0.1% of the taxable value of the demolished part (the Fiscal Code art. 474 para. 9).
- Site organisation, when not included in another permit: 3% of the authorised value of the organisation works (the Fiscal Code art. 474 para. 12).
- Campsites, tent camps, cabins or caravans: 2% of the authorised value of the works (the Fiscal Code art. 474 para. 13).
- Boreholes and excavations for geotechnical or topographic studies: an amount per affected square metre, set by the local council (the Fiscal Code art. 474 para. 10).
- Amendment permit: no new fee; it is regularised before reception (the Codul urbanismului art. 313 para. 2).
- Emergency first-intervention works, places of worship, historic monuments: exempt from authorisation fees (the Codul urbanismului art. 313 para. 3).
How AutoRize helps
- Surfaces the official fees and deadlines relevant to your project, all in one place.
- Sends reminders for the important deadlines, so you do not miss key dates.
- The avize directory shows the fees and the issuing institutions your file involves.
- Generates documents on the F.1 and F.8 forms, in Word and PDF, with AI auto-fill.
Frequently asked questions
How is the building permit fee calculated?
The fee is a percentage of the authorised value of the works, and the percentages are set by the Codul fiscal, not by the primărie: 0.5% for residential buildings and their annexes, 1% for other constructions. What the primărie sets is the minimum construction value per square metre, the floor the declared value cannot go below.
What other fees appear besides the permit?
The fee for the urbanism certificate is always there, plus the fees for the avize required through the certificate. Depending on the project, there may be other fees set by the issuing institutions.
Does AutoRize tell me the exact amount I have to pay?
AutoRize surfaces the official fees and deadlines relevant to your project. The exact amounts are set by the primărie and the issuing institutions, in line with the regulations in force.
What are the deadlines for avize?
Issuing deadlines are set by each issuing institution and by the primărie. AutoRize surfaces the relevant deadlines and sends you reminders for the important dates.
Does AutoRize replace the architect or proiectant?
No. AutoRize generates documents on the official forms and surfaces the fees and deadlines, but it does not replace your authorized architect or proiectant.
How much does extending a building permit cost?
It depends what you are extending. Extending the execution period of the works is taxed at 30% of the initial authorisation fee, under the Codul urbanismului. Extending the certificat de urbanism is taxed separately, also at 30%, of the initial certificate fee, under the Fiscal Code (Legea 227/2015, art. 474 para. 3), which the Codul urbanismului refers to directly. The exact amount is confirmed by the issuing town hall.