The ISU fire safety approval
Not every project needs one, and the urbanism certificate is what tells you whether yours does. Here is how it connects to the rest of the file.
Check which rules apply to you
The urbanism code applies from 25 August 2026. If you already have an urbanism certificate issued before that date, the approvals it requires follow the rules in force when it was issued.
Your application will follow the new rules (CATUC), in force from 25 August 2026.
This result is indicative only. The exact rules for your file are determined by the issuing town hall.
The fire safety aviz and authorisation are issued by the General Inspectorate for Emergency Situations, through the county inspectorates, as the specialist authority for defending life, property and the environment against fires.
What ISU does in the construction process
- Issues approvals and authorisations on fire safety and civil protection, under Law 307/2006 on fire defence and Law 481/2004 on civil protection.
- Checks compliance with the provisions of the approvals it issues, as well as with fire defence measures at investment projects.
- Takes part in the reception commissions for buildings and their related installations.
Deadlines
For avize requested directly, outside the Comisia de acord unic, the general deadline in the Codul urbanismului is at most 15 days from filing the request (art. 269 para. 9). If you opted for the Comisia de acord unic, the approvals are issued within 30 calendar days of filing the complete and correct documentation (art. 269 para. 3).
With ISU, however, do not rely on tacit approval. ISU is a structure of the Ministry of Internal Affairs, and the Ministry belongs to SNAOPSN, the national defence, public order and national security system (annex 1). For SNAOPSN institutions art. 269 para. 15 says the documentation is not deemed complete and the approval is not deemed issued just because the deadline has passed. If you get no answer, follow up with ISU in writing.
Fire-prevention works without a permit
Intervention works for implementing fire prevention and extinguishing measures (installing the specific systems, with a view to obtaining the fire safety authorisation) can be carried out without any authorisation formality, if they are carried out on existing buildings outside protected built-up areas and outside historic monument protection zones (art. 299 para. 2 letter a point 11).
In monument protection zones and protected built-up areas, the same works can be carried out on the basis of prior notificare, with the written approval of the culture directorate, but only if the building is not a classified historic monument or in the process of being classified, and has no architectural or historic value established through the urbanism documentation (art. 294 para. 3).
How AutoRize helps
- Generates the approval requests to the issuers, filled in with your project data.
- Prepares the opis (document index), so you can see which approval is missing before filing.
- Fills in the F_A_01 request, where the approvals obtained are listed.
- Gives you the documents in Word and PDF, ready to file.
Frequently asked questions
Do I need an ISU approval for my house?
It depends on the project. The urbanism certificate issued for your case lists the approvals required, and the fire safety approval appears there only if the project falls into the categories it is required for. Go by the certificate, not by assumptions.
Who issues the fire safety approval?
The emergency situations inspectorate of the county the property sits in. For example, for Târgu Mureș that is ISU Mureș.
Can I file the permit application without the ISU approval?
Not if the urbanism certificate lists it among the required approvals. A file submitted without an approval the certificate required is incomplete and delays the permit.
Should I request the ISU approval before or after PAC?
The documentation for the approval comes from the design, so it makes sense to request it once the designer has settled the fire safety solutions. If you request it too early, you have nothing to submit.
What does the ISU approval cost and how long does it take?
For an aviz requested directly, the general deadline in the Codul urbanismului is at most 15 days from filing (art. 269(9)), but tacit approval does not apply to ISU (art. 269(15)). Through the Comisia de acord unic the deadline is 30 calendar days (art. 269(3)). The fee is set by the issuing inspectorate.
Is the ISU approval the same as the fire safety authorisation?
They are two different things. The approval belongs to the design stage, before the building permit, while the fire safety authorisation is usually obtained when the building is brought into use. Confirm with your county inspectorate which one applies to you and when.
Useful pages for the same dossier
Prepare the approval requests
Generate the requests to the issuers and the opis, filled in with your project data, in Word and PDF.