Registering a newly built house

The code sets out how registration works for one route, the notified one, and ties it to an entry in a National Construction Register that is not live yet.

Citește în română

It is worth saying at the outset what the Codul urbanismului does not contain: a general procedure for registering a finished house in the land book. The code does impose the duty, at article 420 paragraph (8) item i), which lists registration in the land book among the beneficiary’s obligations. But it says how in one place only, and that place covers works carried out under the notification procedure. For the rest, the documents come from the cadastre legislation and from the handover.

The handover procedure is on the dedicated page. Here we look at what the code makes it conditional on, because that is where a new step appears.

The one provision that says something directly

Article 298 paragraph (7) says that registering works carried out under the notification in the land book is done on the basis of proof that the notification was sent and of verification that the entry was made in the National Construction Register.

That is two conditions, not one. The first is yours from the start: proof you sent the notification. The second is not entirely in your hands, because it assumes an entry has been made and can be checked.

Who actually makes the entry

Paragraph (6) puts the duty where most people do not expect it: a copy of the handover report is registered in the National Construction Register, and the duty falls on the beneficiary of the works. Not the builder, and not the town hall.

The text adds the transitional rule that matters today: until the register is operational, a copy of the report is sent physically or by email to the I.S.C. For as long as the register is not operational that is the route, and proof of that transmission is what you will have to show.

The step easiest to postpone is the one that blocks

The order set out in the code has a practical consequence that is often stated backwards. The handover looks like the end of the road, with registration a formality afterwards. In reality a small administrative step sits between them, sending the copy, and without it you have no proof to file with the land registry.

Anyone who built in-house has an extra reason to watch this: there the builder and the beneficiary are the same person, so there is nobody the step can be attributed to. That situation is covered in signing off a house you built yourself, and who falls under the notification regime in do you qualify for the notification.

What stays outside the code

For works carried out under a building permit, the code does not set out a registration procedure. That does not mean registration happens without documents, it means the documents come from elsewhere: the handover at completion and the documentation accompanying it.

One more thing the code asks for at filing, because many people obtain their extracts too early. Article 262 paragraph (1) item b) requires two documents under the same 30-day rule, unless the law provides otherwise: an up-to-date cadastral plan extract and an up-to-date land registry extract. One obtained two months earlier is no longer good when you reach the counter.

The file that closes at the end

The building logbook is completed as the works go and handed over at the end, and its electronic form is covered in the electronic building logbook. It does not replace proof of the entry, but it is the file the later documents are drawn from, at a sale or at a subsequent intervention. The order of the steps is in the order of the steps. If the land has to be split or merged before the file is opened, that operation has a certificate of its own, covered in splitting or merging land.


This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Check your own situation with the issuing authority.

AutoRize Team

Echipa AutoRize

Scriem despre autorizarea construcțiilor în România: ce s-a schimbat, ce înseamnă pentru dosarul tău și ce trebuie făcut acum.

Your certificat de urbanism file, in 30 seconds

AutoRize generates the application, the memoriu de prezentare and the opis for the certificat de urbanism, matched to local planning rules.

Get started