Building permit in Bucharest
Prepare the file for a Bucharest building permit step by step. AutoRize generates the documents on the official forms and shows you what is still missing.
A building permit is the act by which the local administration lets you carry out the works. Bucharest has two possible issuers, and the Codul urbanismului says exactly which one applies: the general mayor issues urbanism certificates and permits for individually listed monuments, properties in protected built areas, buildings of special architectural or historic value, subdivisions on the List of historic monuments, and land that crosses a sector boundary or lies outside the built-up area (art. 130 letter k). For all other works the sector mayor issues them, including in monument protection zones (art. 131 letter h).
For most works the request goes to the town hall of the sector the property is in. It goes to the City Hall of Bucharest if the property is an individually listed monument, sits in a protected built area, has special architectural or historic value set by urban plans, belongs to a subdivision on the List of historic monuments, or the land crosses the sector boundary or lies outside the built-up area (art. 130 letter k). From 1 November 2028 the Code provides for reorganising the general mayor's planning department and moving some competences away from the sectors (art. 584), so the allocation can change. Check with the town hall who the issuer is before you file: if you already have the urbanism certificate, the issuer named on it tells you where the file goes.
The steps for a building permit in Bucharest
The process starts with a request for an urbanism certificate. The certificate states the legal, economic and technical status of the land and lists the approvals you have to obtain. Then come the design, the approvals from each institution, and filing the dossier for the permit. Check the certificate for the issuer: it tells you who the dossier is addressed to.
The approvals you need in Bucharest
The exact list comes from the urbanism certificate and depends on the work and the site. In Bucharest the usual issuers include Apa Nova for water and sewerage, the Muntenia electricity distribution operator, Distrigaz Sud Rețele for natural gas, and the Bucharest-Ilfov Emergency Situations Inspectorate for fire safety. Each has its own request form and its own fees; the deadlines are those in the Codul urbanismului.
The documents in the file
The file generally includes the F_A_01 request form, the ownership documents, the urbanism certificate, the approvals it names, the project for the building permit (PAC), and proof that the fees were paid. The F_CU_04 and F_A_01 forms are national, as is the structure of the technical report, so AutoRize generates them the same way anywhere in the country.
POT, CUT and the urban indicators
The general urban plan of Bucharest was approved in 2000 and remains in force under successive extensions, and in practice many plots are governed by a sector-level coordinating zonal plan. That is why AutoRize gives you the list of zones and subzones from the PUG regulation, so you can pick your zoning, but does not fill in POT and CUT for you. Those come from your own urbanism certificate, which is the document that says what applies to your plot, and the completion report shows you exactly what is still blank.
How AutoRize helps
- The list of zones and subzones from the Bucharest PUG regulation, so you can pick your zoning without digging through documentation.
- Generates the urbanism certificate request, the technical report, the index and the approval requests on the F_CU_04 and F_A_01 forms, in Word and PDF.
- Asks for the property's sector and addresses the request to that sector's town hall. If the property is an individually listed monument, sits in a protected built area, or the land crosses the sector boundary, the issuer is the City Hall of Bucharest: change the addressee before you file.
- The completion report tells you what is still to be carried over from the urbanism certificate, field by field, so you do not file an incomplete dossier.
Frequently asked questions
Where do I get the urbanism certificate in Bucharest?
From the town hall of the sector the property is in, for most works, including in monument protection zones. From the City Hall of Bucharest, among other cases, if the property is an individually listed monument, sits in a protected built area, has special architectural or historic value, belongs to a subdivision on the List of historic monuments, or the land crosses a sector boundary or lies outside the built-up area (Codul urbanismului, art. 130 letter k and art. 131 letter h).
Which approvals do I need to build in Bucharest?
The ones written in your urbanism certificate. They may include approvals from Apa Nova, from the electricity distribution operator, from Distrigaz Sud Rețele or from the Bucharest-Ilfov Emergency Situations Inspectorate. The certificate is the list that counts, not a generic one.
Does AutoRize replace the architect or the designer?
No. AutoRize helps you prepare and generate administrative documents on the official forms, but the technical documentation must be drawn up and signed off by designers entitled to do so.
Why does AutoRize not fill in POT and CUT for Bucharest?
Because the source is not firm enough. The 2000 PUG remains in force under successive extensions, and your plot is often governed by a sector zonal plan. A number taken from such a source would end up in a filed dossier, so we would rather ask you to carry it over from your own urbanism certificate.
Can I use AutoRize for free in Bucharest?
Yes. The free account, no card required, shows you in the app the documents generated on the national forms, for any locality in Romania, Bucharest included; downloading them in Word and PDF comes with a paid dossier or a subscription.