Building Permit (Autorizație de Construire) in Târgu Mureș
Prepare your building permit dossier for Târgu Mureș step by step. AutoRize generates the documents on the official forms and shows you which avize are required in the city.
The autorizație de construire is the act by which Primăria Târgu Mureș lets you carry out construction or demolition works. The process involves a certificat de urbanism, a series of avize from local institutions and a complete technical dossier. AutoRize helps you prepare these documents correctly for your case in Târgu Mureș, without starting from scratch.
Steps for a building permit in Târgu Mureș
In general, the path starts with a certificat de urbanism request filed with Primăria Târgu Mureș. The certificate tells you the legal, economic and technical status of the land, the urbanism indicators and the avize you will need. Next you obtain the required avize and acorduri, then a proiectant autorizat prepares the PAC technical dossier. Finally you submit the building permit application on the official form. The deadlines come from the Codul urbanismului, and the fees from the Codul fiscal and the decisions of the Târgu Mureș local council.
Avize required in Târgu Mureș
The exact list of avize comes from the certificat de urbanism and depends on the type of work and the location. In Târgu Mureș, common issuers include Aquaserv for water and sewerage, Distribuție Energie Electrică România for electricity, Delgaz Grid for natural gas and ISU Mureș for fire safety, alongside other local and county institutions. Each aviz has its own dossier, its own number of required copies and its own fee, set by the issuing institution.
Documents in the dossier
The building permit dossier generally includes the application on the F_A_01 form, ownership documents, the certificat de urbanism, the avize and acorduri obtained, the PAC technical documentation and the opis listing the dossier items. AutoRize generates the applications and administrative documents on the F_CU_04 and F_A_01 forms, in Word and PDF, so you can fill them in, check them and submit them more easily.
POT, CUT and urbanism indicators
Before design you need the urbanism indicators of the plot: the UTR territorial reference unit, the POT land occupancy ratio and the CUT land use coefficient, as set out in the approved urbanism documentation for Târgu Mureș. AutoRize helps you identify and use these indicators when preparing the documents.
How AutoRize helps
- Available now for Târgu Mureș, with the city's list of avize: issuer, fee, required documents and number of copies for each aviz.
- Generates the certificat de urbanism request, the memoriu tehnic, the opis and the avize requests on the F_CU_04 and F_A_01 forms, in Word and PDF.
- AI auto-fill, so you do not retype the same data each time and you reduce errors in the documents.
- Information on the UTR, POT and CUT urbanism indicators, fees and deadlines, adapted to the Târgu Mureș context.
Frequently asked questions
Where do I get the certificat de urbanism in Târgu Mureș?
The certificat de urbanism is obtained from Primăria Târgu Mureș, based on an application on the official form. It tells you the status of the land, the urbanism indicators and the list of avize required for the building permit.
Which avize do I need to build in Târgu Mureș?
The required avize are specified in the certificat de urbanism. In Târgu Mureș these may include, for example, avize from Aquaserv, Distribuție Energie Electrică România, Delgaz Grid or ISU Mureș, depending on the type and location of the work.
Does AutoRize replace the architect or proiectant?
No. AutoRize helps you prepare and generate administrative documents on the official forms, but the technical documentation must, where the law requires it, be checked and signed by an authorised specialist, who takes responsibility for it.
How much does a building permit cost and how long does it take in Târgu Mureș?
The deadlines are those of the Codul urbanismului, as in the rest of the country: the building permit within at most 30 calendar days of filing the complete documentation (art. 273 para. 1), avize requested directly from institutions within at most 15 days (art. 269 para. 9), with exceptions for environment, monuments, central authorities that review the documentation in a commission, and the Aeronautical Authority. The certificat de urbanism fee is set by the Târgu Mureș local council within the limits of art. 474 of the Codul fiscal. The building permit fee starts from the rates in art. 474 of the Codul fiscal (art. 313 para. 1 of the Codul urbanismului): 0.5% of the authorised value of the works for residential buildings and annexes, 1% for other structures, on top of which the local council can apply additional rates of up to 100% (Codul fiscal, art. 489 paras. 1-2). Each issuing institution sets its own aviz charges. Confirm the exact amount with Primăria Târgu Mureș.
Can I use AutoRize for free in Târgu Mureș?
Yes. The free account, no card required, shows you in the app the documents generated on the national forms, for any locality in Romania, Târgu Mureș included; downloading them in Word and PDF comes with a paid dossier or a subscription.
Useful pages for the same dossier
Prepare your dossier for Târgu Mureș
Start free with AutoRize and generate your building permit documents for Târgu Mureș on the official forms, with the avize and indicators suited to the city.