The certificat de urbanism is the document in which the town hall tells you which rules apply to your land: what may be built, under which conditions and, if you want to build, which approvals you will need. It does not give you the right to build; that only comes with the building permit.

Check which rules apply to you

The urbanism code applies from 25 August 2026. If you already have an urbanism certificate issued before that date, the approvals it requires follow the rules in force when it was issued.

Do you already have an issued urbanism certificate (CU)?

Your application will follow the new rules (CATUC), in force from 25 August 2026.

This result is indicative only. The exact rules for your file are determined by the issuing town hall.

In short, for building or demolishing a building: the town hall issues the certificate within 15 working days of registering the request, the fee is set by the local council within the limits of the Codul fiscal, and the certificate is valid for 12 to 36 months. It can be extended by up to 24 months if you ask for the extension at least 15 working days before it expires.

01

Documents needed

For a certificat de urbanism for building or demolition, the request is made on form F_CU_04 with these attachments (Codul urbanismului, art. 257 para. 8, and Order 975/2026):

  • the up-to-date land registry extract;
  • the proposed site plan, showing the ground footprint of the buildings to be built, extended or demolished;
  • the zone plan, in the Stereo 70 system;
  • a short description of the investment, from which the town hall sees how the project fits the urban planning documentation and which approvals it needs;
  • the power of attorney, if someone files the request on your behalf.

Other purposes use another form: F_CU_01 for information and F_CU_02 for cadastral operations. The ready-to-fill form and what each attachment must contain are on the page about the certificat de urbanism request.

02

How much it costs and how long it takes

The fee is set by the local council, within the ranges in art. 474 of the Codul fiscal, to which the Codul urbanismului refers (art. 253 para. 10). The scale depends on the area for which you request the certificate. The base amounts in the law, for urban areas, are:

  • up to 150 m²: 5-6 lei;
  • 151 to 250 m²: 6-7 lei;
  • 251 to 500 m²: 7-9 lei;
  • 501 to 750 m²: 9-12 lei;
  • 751 to 1,000 m²: 12-14 lei;
  • over 1,000 m²: 14 lei, plus 0.01 lei for every m² above 1,000.

In rural areas the fee is half of these amounts, and extending the certificate costs 30% of the original fee (art. 474 paras. 2 and 3). Local councils index the amounts every year by the inflation rate (art. 491 of the Codul fiscal), so the exact amount is in your town hall's local taxes decision.

The issuing deadline is set by law, depending on the purpose:

  • building or demolition for buildings and site works: within 15 working days of registering the request (art. 257 para. 4);
  • information: within 5 working days if the town hall has a working IT system, otherwise within 10 (art. 254);
  • cadastral operations: within 10 working days (art. 256 para. 4).

The fee for the building permit that follows the certificate is calculated differently, from the value of the works: you can estimate it with the fee calculator.

03

The five types

The Codul urbanismului classifies the certificat de urbanism into five categories, depending on purpose:

  • For information, deadline: 5 working days if the town hall has a functioning IT system (in which case it is issued automatically), otherwise 10 working days.
  • For cadastral operations (subdivision, merger, easements, land register records), deadline: 10 working days.
  • For construction/demolition of buildings and site works, deadline: 15 working days. This is the type required for most construction projects.
  • For construction/demolition of engineering works, deadline: 15 working days, except for transport infrastructure, for which the deadline is 15 calendar days.
  • For special-purpose constructions: issued by institutions in the national defence, public order and national security system (SNAOPSN, art. 253 para. 7), based on a certificat de urbanism for information issued by the town hall. The deadline is set by the issuing institution; the law does not provide a fixed number of days.

A certificat de urbanism can be issued for several purposes at once and for several properties.

04

What it contains

  • The legal, economic and technical status of the property.
  • The mandatory conditions for carrying out the investment.
  • The list of required specialist studies.
  • The obligation to prepare a PUD, if applicable.
  • The complete list of required avize and agreements, grouped into two categories: those obtained through the Single Approval Commission and those you obtain directly.
  • The validity period.
05

What the town hall can decide

  • Issues the certificat de urbanism.
  • Issues the certificate, but with the obligation to prepare a PUD.
  • Issues the certificate, but with the obligation to prepare and approve a PUZ, only in the situations provided for by the PUG or explicitly by law.
  • Rejects the request through a negative certificat de urbanism, giving reasons in fact and in law.

If the certificate requires preparing a PUZ or PUD, it can only be used after that documentation is approved, and it remains valid for a further 12 months after approval.

06

Validity and extension

The town hall sets the validity period between 12 and 36 months from issuance, depending on the purpose of the request, the complexity of the investment and whether the urban planning documentation remains valid. For public investments, the period can go up to 60 months.

The extension must be requested at least 15 working days before expiry (art. 257) and is granted for at most 24 months. After that, a new certificate is required.

Validity ends if you give up your intention to build (with the obligation to notify the town hall) or if you do not request the extension in time.

07

How to request it online

The Code creates the Ghișeul unic național, the platform through which planning and permit requests will be sent online to town halls (art. 139). It is being rolled out in stages, within 5 years of the Code's publication, and until it becomes mandatory town halls may keep working the way they do now. So how you file differs from one town hall to another: check your town hall's website for how it accepts requests.

You can receive the answer digitally: on form F_CU_04 you tick delivery to your email address, and a certificate issued digitally, signed electronically, has the same legal value as the paper one (art. 257 paras. 2 and 7).

AutoRize fills in the request on F_CU_04 and prepares the technical memo and the opis, in Word and PDF, so you can file them however your town hall accepts them.

How AutoRize helps

  • Generates the certificat de urbanism request directly on the form that fits the purpose, F_CU_01 to F_CU_04, in Word and PDF.
  • AI auto-fill: upload the urbanism certificate or the land registry extract and AutoRize extracts your project data.
  • Prepares the technical memo and the opis too, so your file is complete and ready to submit.
  • Quickly look up UTR, POT and CUT indicators and browse the list of avize by institution.
Start free

Frequently asked questions

What is a certificat de urbanism?

It is a document issued by the town hall showing the legal, economic and technical status of a plot: what may be built and which avize will be needed. It is not a building permit.

What documents do I need for the certificat de urbanism request?

For building or demolition, the request is made on form F_CU_04 with the up-to-date land registry extract, the proposed site plan showing the buildings' ground footprint, the zone plan in the Stereo 70 system, a short description of the investment and, if a representative files it, the power of attorney (Codul urbanismului, art. 257 para. 8, and Order 975/2026).

How much does a certificat de urbanism cost and how long does it take?

The fee is set by the local council, within the ranges in art. 474 of the Codul fiscal, according to the area for which you request the certificate: in urban areas the base amounts run from 5-6 lei (up to 150 m²) to 14 lei plus 0.01 lei for every m² above 1,000 m², and in rural areas they are half; councils index them every year by inflation. The issuing deadline is set by law at no more than 15 working days for a certificat de urbanism for building or demolition (Codul urbanismului, art. 253 para. 10 and art. 257 para. 4).

How long is the certificate valid?

For a certificat de urbanism for building or demolition, the town hall sets the validity at 12 to 36 months from issue, depending on the purpose and the complexity of the investment; for public investments it can reach 60 months. It can be extended by up to 24 months if you ask for the extension at least 15 working days before it expires (Codul urbanismului, art. 257 paras. 15-18).

Does AutoRize replace an architect or designer?

No. AutoRize generates and prepares the documents, but where the law requires it they must be checked, endorsed and signed by an authorised specialist.

What is a certificat de urbanism for information?

It is a certificate requested only to learn the rules that apply to a plot: what can be built and under which conditions. It has its own form, F_CU_01, and AutoRize can generate the request for this purpose too.

Prepare your certificat de urbanism request now

Start free, no card required, and generate the documents on the official forms in minutes.

×