CERTIFICATE FOR INFORMATION

The urbanism certificate for information

Find out the legal, economic and technical regime of a plot before any investment, with the request generated automatically on the F_CU_01 form.

Check which rules apply to you

The urbanism code applies from 25 August 2026. If you already have an urbanism certificate issued before that date, the approvals it requires follow the rules in force when it was issued.

Do you already have an issued urbanism certificate (CU)?

Your application will follow the new rules (CATUC), in force from 25 August 2026.

This result is indicative only. The exact rules for your file are determined by the issuing town hall.

The urbanism certificate can also be requested purely to inform yourself, without having a project yet; you will also find it called certificat de informare or certificat de urbanism informativ. It is the simplest way to learn what can be built on a plot before you buy it, or before you pay a designer.

Download the blank F_CU_01 form

The request for the information urbanism certificate, the official model from Order 975/2026, with the issuing authority fields left blank so you can use it at any town hall.

The forms are provided for information. Always check the town hall website to see whether it asks for extra annexes.

01

Who can request it and how long it takes

  • It can be requested by any interested individual or legal entity: you don't need to be the owner.
  • Any number of informational certificates can be issued for the same property, and the content is identical for all applicants.
  • Deadline: 5 working days if the town hall has a functioning IT system, in which case it is issued automatically, with an electronic seal. Until the IT system is functioning: 10 working days.
  • It is issued in written or digital format, at your choice, stated on the standard request form.
  • In the request you enter the cadastral number, if the property is registered in e-Terra. If it is not, you attach a zone location plan in the Stereo 70 system, issued on request by the cadastre office; if the property has a land register entry but no up-to-date cadastral data, you also attach the land register extract, no older than 30 days (art. 254 paras. 10-12).

If you want to build or demolish, you need a different type, the certificat de urbanism for building or demolition, requested on form F_CU_04.

02

What it contains

  • The legal regime: ownership right and other real rights, public-utility easements, whether the land is inside or outside the built-up area, whether the property is in a protected zone or has building restrictions, whether it is a historic monument.
  • The economic regime: current use, permitted or prohibited functions, tax rules specific to the area.
  • The technical regime: the reference territorial unit, the functional zone, POT, CUT, the minimum and maximum plot dimensions, the provision of roads and parking, the alignment of the land and buildings, the minimum and maximum permitted heights.
  • Information about the utility networks in the area, including an extract from the GIS system.
  • A location plan within the applicable urban planning documentation.

How AutoRize helps

  • Generates the urbanism certificate request on the F_CU_01 form, the one for the information certificate.
  • Extracts the land data automatically from the uploaded land registry extract.
  • Helps you read the urbanistic indicators in the certificate you receive: POT, CUT, UTR.
  • When you move to a project, AutoRize reuses the same data for the permitting dossier.
Start free

Frequently asked questions

Does the informational certificate let me build?

No. It is an information document about the land regime. To carry out works you need a building permit, obtained on the basis of a complete dossier.

Can I request a certificat de urbanism de informare for a plot that is not mine?

A certificat de urbanism de informare can be requested by any interested person, precisely because it is for information. Check the exact filing conditions with the issuing town hall.

How much does a certificat de urbanism de informare cost?

The fee is set by the local council according to the surface of the plot, with a reduced value in rural areas. The exact amount is confirmed by the town hall where you file the request.

How long is a certificat de urbanism de informare valid?

The Code sets no validity period for it, and the official model (F_CU_05) has no validity field: the certificate states the rules in force on the date it is issued (art. 253(1)). It cannot be extended. If the planning documentation has changed since, request a new one. An extension, for at most 24 months, exists only for the certificat de urbanism for building or demolition (art. 257(17)).

Which form do I use for a certificat de urbanism de informare?

Form F_CU_01, which Order 975/2026 approved specifically for the information certificate. AutoRize generates it filled in with your data.

Request the urbanism certificate for information