PAC: the project for authorising construction
Learn what PAC is (the project for authorising construction, formerly the DTAC documentation), what it contains and who must prepare it. AutoRize generates the administrative documents of the dossier on the official forms.
Check which rules apply to you
The urbanism code applies from 25 August 2026. If you already have an urbanism certificate issued before that date, the approvals it requires follow the rules in force when it was issued.
Your application will follow the new rules (CATUC), in force from 25 August 2026.
This result is indicative only. The exact rules for your file are determined by the issuing town hall.
PAC, the project for authorising construction, is the technical documentation on which the building permit is issued. Before the Codul urbanismului took effect, the same documentation was called DTAC. AutoRize helps with the administrative side of the dossier so you reach submission faster.
What is PAC
The law defines it as the project prepared for issuing the building permit, drawn up by specialist technical teams according to the nature of the works, and adopted and signed by university-trained technical staff in architecture, urbanism, construction and building installations. Adopting a project prepared by someone else is forbidden.
What PAC contains
- Site location plan.
- Site plan showing the current situation, with at least two relevant photographs.
- Site plan showing the proposed situation.
- The architecture project (for buildings): technical memoriu and drawings.
- The engineering project: speciality technical memorii and drawings, plus, where applicable, calculation notes, a geotechnical survey and the expert report on the impact on neighbouring properties (Annex 2 item 1.6).
- Plan of the underground structures, marking utility connections to the technical infrastructure.
What happens after PAC
PAC brings the solutions set at the concept stage into a final configuration for the purpose of authorisation. Once the permit is obtained, PAC is developed further, technically, in the next stage: the technical execution project (PTh) and the execution details (DE), without changing the basic technical elements set in PAC.
PAC, PAD and the technical project
PAC is the project on which construction works are authorised, while PAD (formerly DTAD) is the equivalent for demolition. The technical execution project later details the PAC solution to the level at which the builder can execute the works. The natural order is: certificat de urbanism, PAC, the avize obtained on the basis of the PAC, the permit, then the technical project and the start of works.
Where PAC fits in the permitting process
The full journey looks like this: you obtain the certificat de urbanism, the designer prepares the PAC, on that basis you obtain the avize and agreements the certificate requires (directly or through the Comisia de acord unic), and you submit the dossier with the permit request on the F_A_01 form. AutoRize generates the F_A_01 request, the memoriu, the opis and the aviz requests, filled in with your project data, so the paperwork does not slow you down.
Simplified content for small rural homes
For single-family homes of at most ground floor plus attic storey and a maximum built floor area of 150 sqm, located in rural areas, a simplified framework content applies, with a summary memoriu instead of the complete technical memoriu.
How AutoRize helps
- Generates the permit request on the F_A_01 form, plus the dossier opis, in Word and PDF.
- Prepares the aviz requests and the memoriu, filled in with your project data.
- AI auto-fill: upload the certificat de urbanism and the data is extracted for you.
- Shows the relevant fees, deadlines and avize, so you always know the next step.
Frequently asked questions
What does PAC mean?
PAC stands for proiectul pentru autorizarea construirii, the project for authorising construction, the new name for the former DTAC documentation. It is the technical dossier on which the town hall issues the building permit.
What is the difference between PAC and the technical project?
PAC serves the permitting stage and is detailed enough for the town hall analysis. The technical execution project then details the solution so the works can be executed on site.
Can I prepare the PAC myself, without an architect?
No. The law requires the technical documentation to be prepared and signed by licensed specialists, and in certain cases also checked by certified verifiers.
What is PAD?
PAD is the technical documentation for authorising demolition works, formerly called DTAD, the PAC equivalent for when you want to demolish a building.
Does AutoRize generate the complete PAC?
No. The technical part of the PAC belongs to the licensed designer. AutoRize generates the administrative documents: the F_A_01 request, the memoriu, the opis and the aviz requests, filled in with your project data.