PAC: the project for authorising construction
Learn what PAC is (the project for authorising construction, formerly the DTAC documentation), which pieces it contains and who must prepare it. AutoRize generates the administrative pieces of the dossier on the official forms.
Check which rules apply to you
The urbanism code applies from 25 August 2026. If you already have an urbanism certificate issued before that date, the approvals it requires follow the rules in force when it was issued.
Your application will follow the new rules (CATUC), in force from 25 August 2026.
This result is indicative only. The exact rules for your file are determined by the issuing town hall.
PAC, the project for authorising construction, is the technical documentation on which the building permit is issued. Before the Codul urbanismului took effect, the same documentation was called DTAC. AutoRize helps with the administrative side of the dossier so you reach submission faster.
What is PAC
The law defines it as the project prepared for issuing the building permit, drawn up by specialist technical teams according to the nature of the works, and adopted and signed by qualified technical staff in architecture, urbanism, construction and building installations. Adopting a project prepared by someone else is forbidden.
What PAC contains
- Site location plan.
- Site plan showing the current situation, with at least two relevant photographs.
- Site plan showing the proposed situation.
- The architecture project (for buildings): technical memoriu and drawings.
- The engineering project: speciality technical memorii, calculation notes, geotechnical survey, survey of the impact on neighbouring properties, drawings.
- Plan of the underground structures, marking utility connections to the technical infrastructure.
What happens after PAC
PAC brings the solutions set at the concept stage into a final configuration for the purpose of authorisation. Once the permit is obtained, PAC is developed further, technically, in the next stage: the execution technical project (PTh) and the execution details (DE), without changing the basic technical elements set in PAC.
PAC, PAD and the technical project
PAC authorises construction works, while PAD (formerly DTAD) is the equivalent for demolition. The execution technical project later details the PAC solution to the level at which the builder can execute the works. The natural order is: certificat de urbanism, avize, PAC and permit, then the technical project and the start of works.
Where PAC fits in the permitting process
The full journey looks like this: you obtain the certificat de urbanism, gather the avize and agreements it requires, the proiectant prepares the PAC, and you submit the dossier with the permit request on the F.8 form. AutoRize generates the F.8 request, the memoriu, the opis and the aviz requests, filled in with your project data, so the paperwork does not slow you down.
Simplified content for small rural homes
For single-family homes with a maximum ground-floor-plus-attic height regime and a maximum built floor area of 150 sqm, located in rural areas, a simplified framework content applies, with a summary memoriu instead of the complete technical memoriu.
How AutoRize helps
- Generates the permit request on the F.8 form, plus the dossier opis, in Word and PDF.
- Prepares the aviz requests and the memoriu, filled in with your project data.
- AI auto-fill: upload the certificat de urbanism and the data is extracted for you.
- Shows the relevant fees, deadlines and avize, so you always know the next step.
Frequently asked questions
What does PAC mean?
PAC is the technical documentation for authorising construction, the new name for the former DTAC documentation. It is the technical dossier on which the town hall issues the building permit.
What is the difference between PAC and the technical project?
PAC serves the permitting stage and is detailed enough for the town hall analysis. The execution technical project then details the solution so the works can be executed on site.
Can I prepare the PAC myself, without an architect?
No. The law requires the technical documentation to be prepared and signed by licensed specialists, and in certain cases also checked by certified verifiers.
What is PAD?
PAD is the technical documentation for authorising demolition works, formerly called DTAD, the PAC equivalent for when you want to demolish a building.
Does AutoRize generate the complete PAC?
No. The technical part of the PAC belongs to the licensed proiectant. AutoRize generates the administrative pieces: the F.8 request, the memoriu, the opis and the aviz requests, filled in with your project data.