A pool in the garden: which permit you need

Fixed pool: notification only in a village, by a house, built-up area, approved planning, not metropolitan or protected, max 50 sq m in total; else a permit.

Citește în română

Legea 169/2026 mentions swimming pools in five places. Four of them are in the annex 1 definitions (two of those concern the POT and CUT calculation), and only one tells you which document you need: article 294, which allows notification (notificare) for pools next to a house in a village. Any pool that does not fit that rule falls back on the general rule, the building permit (autorizație de construire). Below are the exact conditions, the cases the Code does not name (above-ground pools, inflatable pools, telescopic enclosures) and what to do if the pool is already dug.

Which document your pool needs, case by case

SituationDocumentWhere it says so
In-ground pool, or one with a foundation, in a town or cityBuilding permitart. 245 para. (1)-(2), art. 259 para. (6)
Pool next to a house, in a village, inside the built-up area (intravilan), in a rural locality outside metropolitan zones, outside protected zones, with approved urban planning, at most 50 sq m in total with the other new structures in the yardNotificationart. 294 para. (2) lit. a) pt. (i)
The same pool in a rural locality inside a metropolitan zone, above 50 sq m in total, or on a plot with no houseBuilding permit (plot with no house: our reading)art. 259 para. (6)
Pool in a protected built-up zone or in a monument’s protection zoneOur reading: permit, with the prior approval or consent required in protected zonesart. 190 para. (1), art. 294 para. (2) lit. a)
Inflatable pool, set on the lawn for the summerThe Code does not name it; our reading: not a constructionannex 1, definition of construction
Pool already built without papersOur reading: regularisation, as an annex of at most 150 sq m, if it meets the legal conditions (uncertain in protected zones)art. 301 para. (2)

Why a pool has no formality-free route

The list of works that need no formality at all does not include pools. Article 299 paragraph (2) letter c) allows, in villages and with no permit and no notification (the structures are only declared for tax, paragraph (12)), covered terraces, pergolas, summer kitchens, kiosks, sheds, sanitary blocks and the like, at most 20 sq m in total, 2.5 m high, without a foundation, provisional, demountable, on a wood or metal structure. The pool is missing from exactly this list, although article 294 puts it next to the same structures.

The text does not say why. An in-ground pool is a cast or prefabricated tank set in an excavation, which is exactly what the 20 sq m exception rules out: a foundation and permanence. Article 294 expressly covers structures of exactly this kind, including those under 20 sq m built with a foundation, permanent, non-demountable, so for an in-ground pool the lightest possible regime is notification, and the 20 sq m no-formality route does not apply. For a demountable pool on a metal frame the question stays open, and we come back to it below.

The basic rule is in article 245: the right to build is exercised on the basis of the permit, and notification and no-formality works are exceptions. Article 259 paragraph (6) says the same thing from the other side: the permit is mandatory, except for works the law leaves to notification or to no formality.

Notification: six conditions that must all be true

Article 294 paragraph (2) letter a) point (i) accepts on notification new structures outside single-family houses, garages, covered terraces, pergolas, summer kitchens, kiosks, pools, sanitary blocks and the like, that do not exceed 50 sq m in total. The text sets its conditions in two places, the opening of letter a) and point (i), and your pool passes only if it meets all of them:

  1. Rural area. In a town or city there is no notification route for a pool.
  2. Inside the built-up area. On land outside it (extravilan), even in a commune, notification does not apply. How to find out where your plot sits is explained in land inside or outside the built-up area.
  3. Not in a rural locality of a metropolitan zone. The text expressly excludes rural localities located in metropolitan zones.
  4. Approved urban planning documents, which the pool complies with.
  5. Outside protected zones and outside monuments’ protection zones. There, our reading is that the pool needs a permit, with the prior approval or consent required in those zones (article 190 paragraph (1)).
  6. At most 50 sq m in total, together with the other new structures outside the house. A 30 sq m garage and a 25 sq m pool exceed the threshold together, even if each is below it.

One more condition is hidden in the wording: the structures must be outside single-family houses. Our reading is that with no house on the plot the rule does not apply, and a pool on an empty plot needs a permit.

Notification does not mean no design. Article 295 paragraph (4) requires a form and a simplified technical design, drawn up by an architect with signing rights and by engineers. As a household annex, the pool does not need the public health opinion (article 267 paragraph (2) letter b), except where the law expressly requires a health impact study) or the environmental act (article 268 paragraph (2) letter b)). How the yard’s surfaces add up when you already have annexes is explained in household annex: maximum size.

Above-ground and inflatable pools

The Code does not talk about above-ground or inflatable pools. The only reference point is the definition of a construction in annex 1: a work consisting of a structure fixed in or on the ground. An inflatable pool set on the lawn in June and packed away in September is fixed to nothing. Our reading is that it is not a construction and needs no document.

An above-ground pool on a metal frame is harder to place. If you set it on a concrete slab poured for it, the slab is a work fixed on the ground, and the whole comes close to the definition. It might look as if it fits the 20 sq m village exception, being demountable and on a metal structure. Our reading is that it does not: letter c) requires structures without a foundation, and a slab poured for the purpose is hard to read as anything else; the pool is also missing from that list, although it is named in the neighbouring list in article 294. The text does not say how the town hall should classify such a case, so a written question before you pour the slab is cheaper than a fine. In a town or city, with no exception to cover it, a pool on a poured slab still needs a permit.

The Urbanism Code does not set a distance to the neighbour’s fence for pools specifically; the general rules are in how close to the neighbour you can build.

Covering the pool changes the calculation

A fixed enclosure can bring the pool’s surface into the POT and CUT, because the annex 1 texts cover only uncovered pools. Annex 1 deducts the surfaces of uncovered outdoor pools from the gross floor area used for the CUT (floor area ratio). For the POT (plot coverage ratio), the definition lists the surfaces of outdoor pools without a cover without saying expressly whether they are added or subtracted.

The page on POT, CUT and UTR explains why the list most likely reads as one of exclusions. What matters in both places is the same idea: uncovered, without a cover. A pool under a fixed enclosure is no longer uncovered, so the CUT deduction falls away, and its surface may count in the ratios. Our reading is that the enclosure is itself a new structure, under the same rules as the pool: notification in a village, under the conditions above, and a permit everywhere else. For a telescopic enclosure that you pull over only in winter, the Code says nothing.

If your plot is close to its POT limit, run the numbers for the covered version before you sign with the supplier.

If the pool is already built

Annex 1 names the pool among household annexes, alongside garages, greenhouses and sheds, with the qualifier as a rule, in rural areas. Article 301 paragraph (2) allows the regularisation permit (autorizație de regularizare) for house annexes, household annexes or farm annexes of at most 150 sq m of gross floor area. Our reading is that a pool built without papers can be regularised as an annex (in a town, as a house annex), if it meets all the conditions of paragraphs (3)-(4) and has the technical expert reports of paragraph (9).

If not, paragraph (5) leads to demolition, and paragraph (6) lets the town hall require a building permit or a partial demolition instead, where technical solutions exist. For a pool in a protected zone, access to regularisation is uncertain: the exclusion of protected zones in the same paragraph attaches, grammatically, to houses. For a pool on a plot with no house, which by our reading is not a house annex, only the one-year window of paragraph (7) remains, with fees multiplied by ten (paragraph (8)).

The steps are on the page on the regularisation permit.

Fines come from article 357 paragraph (4): between 5,000 and 50,000 lei for works done without the required notification (letter a)) and between 50,000 and 1,000,000 lei for works done without the required building permit (letter b)). The 100,000 lei ceiling quoted in some press articles does exist in the Code, but for other offences (paragraph (4) letters d)-f)), not for works done without notification or without a permit. In a historic monument’s protection zone or a protected built-up zone, a pool built without a permit is not an administrative offence but a crime: 3 months to 1 year in prison or a criminal fine (article 356 paragraph (1) letter a)). How each band applies is on the page on fines for building without a permit.

Three questions for the town hall, before you dig

Three conditions cannot be checked from your yard, and any one of them can move the pool from notification to a permit. Is your locality part of a metropolitan zone? Is the plot inside the built-up area, outside protected zones, and covered by approved urban planning documents? And which new structures in the yard count with the pool towards the 50 sq m threshold? The text does not say whether annexes built years ago count too, so ask that as well. A request that only asks which regime applies is not a notification and does not start the notification clock; it is handled as an ordinary petition (article 295 paragraph (9)).

The full list of works that can go ahead without a permit, with the conditions for each, is on the page on works without a building permit, and the notification procedure, with the form and the deadlines, on the page on simplified notification.


This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.