Enclosing a balcony: permit or notification?

In a block, a balcony is enclosed on a notification only if uniform and outside protected built-up zones. When you need a permit, and one closed without papers.

Citește în română

Most guides to enclosing a balcony still quote Legea 50/1991, which was repealed on 25 August 2026. The answer now comes from the Urban Planning Code (Legea 169/2026) and is split across three articles: one for works that need no formality at all, one for the notification and one for regularisation. If you searched for the enclosed balconies law, these are the articles: there is no separate balcony law. For the enclosure itself, none of them tells sliding glass from PVC double glazing or acrylic sheet. What counts is what the rest of the façade looks like, where the building is, and whether the balcony is already enclosed.

Romanian terms are kept in the original: the notificare is the simplified procedure that replaces the building permit (autorizație de construire) for a short list of works.

The answer, case by case

SituationRegimeWhere it is
The balcony is already lawfully enclosed and you only replace the frames, same shape, same openingsNo permit and no notification, outside protected built-up zones and monument protection zones; the handover remainsart. 299 para. (2) let. a) pt. 4, para. (5)
The loggias and balconies of the block are enclosed uniformlyNotification to the council, outside protected built-up zones and monument protection zonesart. 294 para. (2) let. b) pt. (iv)
You enclose only your own balcony, differently from the rest of the façadePoint (iv) no longer covers you; without another exception, the building permit remainsart. 245 para. (1)-(2), art. 246 para. (1)
The block is in a protected built-up zone or a monument’s protection zoneThe notification above does not applyart. 294 para. (2) let. b), para. (3)
The balcony was enclosed without papersYou can apply for a regularisation permit, if the enclosure does not reach over public land; uncertain in protected zonesart. 301 para. (2)

Replacing the glazing of a balcony already enclosed

Article 299 paragraph (2) letter a) lists the works on existing buildings that need neither a permit nor a notification, with one condition set at the start: the building is not in a protected built-up zone and not in the protection zone of a historic monument. Point 4 covers repairing and replacing external joinery if the shape, the size of the openings and of the joinery are kept, even when the material changes.

So the old timber frames of a balcony enclosed years ago can be swapped for PVC or a sliding system with no permit and no notification, as long as the openings stay the same. If you widen the openings, lower the parapet or move the enclosure out of its plane, you are no longer under point 4. And a replacement does not legalise an enclosure that was built without papers in the first place; more on that below.

No formality does not mean no rules. Paragraph (3) of the same article keeps the duty to comply with the planning rules and with the technical rules on construction quality, paragraph (4) puts the liability on the owner, jointly with the designers and the builders, and paragraph (5) requires a handover at the end of the works here too, recorded with the detailed design in the building’s technical book and in the National Register of Constructions.

A uniform enclosure goes on a notification

For a balcony that is still open, the simplest door is the notification. Article 294 paragraph (2) letter b) point (iv) puts on its list the uniform enclosure of loggias and balconies in flats in collective housing, again only outside protected built-up zones and monument protection zones.

The Code does not define uniform (în mod unitar), neither in the article nor in annex 1, the one with the definitions. Read plainly, the text describes the same enclosure for the balconies of the block, not the solution each flat picks for itself. If your neighbours already have identical enclosures and yours follows them, you are close to the text. If the façade has five different designs, it is no longer clear what uniform would mean there.

There is no separate application for enclosing a balcony: the template is the notification form F_NOT_01 from Ordin 975/2026. You file it with a simplified detailed design drawn up by architects and engineers, and with payment of the fees (article 295 paragraph (4)). The council has at most 15 working days to ask for clarifications, tell you the work needs a permit, or reject the notification; if it does none of these, tacit approval takes effect when the 15 days run out (article 296 paragraph (1)). Work may start 15 calendar days after that deadline (paragraph (6)). The blank form, in Word or PDF, the steps and the fee are on the page about the simplified notification, and how to check that you qualify, step by step, in do you qualify for simplified notification.

The notification is not an empty formality. Article 297 paragraph (2) treats it as a declaration on your own responsibility that the work qualifies. If it did not, you carried out work that needed a permit. We described the consequence in the notificare moves liability.

On a house, point (iv) does not help you: it concerns flats in collective housing. For a balcony or a terrace enclosed on a house, read extending your house and ask the council.

When you enclose only your own balcony

One flat, a system you chose, a façade where the other balconies stay open: point (iv) no longer covers you here. On the same list, point (vi) allows on a notification façade remodelling, only if it has no load-bearing structural role, but it does not mention balconies, and whether it applies to a single enclosure is a matter of the council’s reading. If neither fits, the general rule remains: article 245 makes the permit the rule and the notification and no-formality works the exceptions (paragraphs (1) and (2)), and article 246 paragraph (1) says the permit is also issued for intervention works on existing buildings.

You can ask the council first. Article 295 paragraph (9), however, says that a request to classify the work under a given permitting regime is not a notification and is dealt with under ordinary law. The question, then, does not start the 15-day clock.

In a block there is also the question of the neighbours’ consent. The Urban Planning Code regulates it in article 261, for the case where the work requires measures to make existing buildings safe, established by a technical expert’s report. The Civil Code, however, lists the load-bearing structure and the perimeter walls among the common parts of the building, unless the law or a legal act provides otherwise (article 649 paragraph (1) letter b)), and an enclosure is fixed to them. What the law on owners’ associations or the block’s own rules add, we have not analysed here; ask the administrator before you order the system.

In a protected zone

Both the no-formality list and the notification point open with the same condition: outside protected built-up zones and monument protection zones. The one opening is article 274(6): in a protected built-up zone, though not in a monument protection zone, works without any formality are allowed only where the local urban planning regulation provides for it. The Code does not say how this squares with the condition at the start of the list, so our reading is that you should ask the town hall first. For buildings in those zones that are not listed monuments or in the course of listing, and have no architectural or historical value established by the planning documents, article 294 paragraph (3) has its own list of works on a notification, sent to the local culture service as well and with its written agreement. Enclosing a balcony is not on it. Even replacing the external joinery is on that list only if the material, the shape and the size of the openings are kept (letter a) point (iv)), so including the material, which outside the zone you may change without papers.

A new enclosure therefore needs a permit, and works in protected zones need the prior approval under article 190 paragraph (1). The stakes are higher than a fine: works carried out without a permit in a monument’s protection zone or in a protected built-up zone are a criminal offence, punishable by 3 months to one year in prison or a fine (article 356 paragraph (1) letter a)). Which approvals stack up there we explained in what approvals a protected zone needs and, near a monument, in a house in a monument’s protection zone.

If the balcony is already enclosed without papers

Article 301 paragraph (2) allows the regularisation permit for works enclosing balconies without extending onto the public domain. The conditions in paragraph (3) are cumulative: environmental protection, the essential requirements for buildings, and the planning rules. Paragraph (9) requires compliance with the essential requirements to be shown by technical expert reports in six fields, from structural strength and stability to energy economy, so regularisation carries an expert’s cost that a notification does not. If the conditions cannot be met, paragraph (5) leads to demolition of the work.

In a protected zone, access to regularisation is uncertain: paragraph (2) ties the exclusion of those zones to houses, and the text does not say clearly whether it also covers balconies. There, the act can also be a criminal offence, as shown above.

Because enclosing a balcony is on the permanent list in paragraph (2), the tenfold levies and fees in paragraph (8) do not concern it. They belong to the temporary exception in paragraph (7), explained in the one-year window for regularisation. The procedure is on the page about the regularisation permit.

The fines are not small. Carrying out work without the required permit is fined 50,000 to 1,000,000 lei, and without the required notification 5,000 to 50,000 lei (article 357 paragraph (1) letters a) and b), paragraph (4) letters a) and b)). The details are on the page about fines for building without a permit.

On 6 November 2026 Order 1389/2026 appeared, with the ministry’s instructions for balconies already enclosed: no doubled tax on the flat in a lawfully built block, regularisation at any time at the ordinary fees, and a 3-year period for the fine. What the order says and where it does not match the Code is in Order 1389 and the balcony enclosed without a permit.

The order to check in

  1. Is the block in a protected built-up zone or in a monument’s protection zone? The urban planning certificate for information (certificatul de urbanism pentru informare) tells you. If so, a new enclosure needs a permit, and an identical replacement of the frames, in the same material, goes on a notification with the culture service’s agreement, only if the block is not a monument and has no architectural or historic value set by the planning documents.
  2. Is the balcony already lawfully enclosed and you only replace the frames, same openings? You file nothing with the council; the handover remains.
  3. Does the enclosure follow one design for the whole block? Notification, with a simplified design.
  4. Otherwise, ask the council in writing and start from the assumption that you need a permit.

This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026, and from the Civil Code (Legea 287/2009). Check your own situation with the issuing authority.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.

Your certificat de urbanism file, in 30 seconds

AutoRize generates the application, the memoriu de prezentare and the opis for the certificat de urbanism, matched to local planning rules.

Get started