The certificate attesting a building's construction

The certificate attesting a building confirms you built to the permit and hold a reception report. Who issues it, what it needs and what to do without a permit.

Citește în română

The certificate attesting a building’s construction (certificatul de atestare a edificării construcției) is the document in which the authority that issued the building permit, usually the town hall, confirms two things: the house was built according to the permit, and a reception report at completion of works exists. On the strength of the certificate and the cadastral documentation, the house is entered in the land register (Law 7/1996, art. 37(1)). It is required by the cadastre law; the Urbanism Code only lists it among the mayor’s powers.

Law 7/1996 does not have a single route for buildings. The document you take to the land register depends on the state of the house:

State of the houseWhat registration rests onLegal basis
Finished, with a permit and receptionThe certificate attesting the building and the cadastral documentationLaw 7/1996, art. 37(1)
Under construction, by stagesThe certificate attesting the stage reached, the report recording that stage and the cadastral documentationLaw 7/1996, art. 37(3)
Built before 1 August 2001The tax certificate (certificat de atestare fiscală) and the cadastral documentationLaw 7/1996, art. 37(2)
Built under a notificationProof the notification was sent and a check of its entry in the National Register of BuildingsUrbanism Code, art. 298(7)
Built without a permit after 1 August 2001None until it is regularised (where art. 301 allows it) and receivedLaw 7/1996, art. 37(1); Urbanism Code, art. 280(8)

Who issues the certificate

Law 7/1996 says the certificate is issued by the local authority that issued the building permit. The Urbanism Code (Legea 169/2026) lists it among the mayor’s powers, exercised through the chief architect’s office (art. 120(1)(h)). The town hall’s planning department prepares it: it proposes its issue (art. 121(2)(g)) and drafts it (art. 121(3)(d)). The same letters also name the certificate attesting the stage of execution.

One case is left unclear. The Code mentions the certificate only under the mayor, although some permits are issued by the president of the county council (art. 304(1)(b)), a situation described in mayor or county council. The cadastre law points to whoever issued the permit, which in this case is the county council president. For a house permitted there, ask the issuing authority where to file the application.

What it actually confirms

The certificate does not attest the quality of the house, nor does it replace reception. It confirms that the house matches the permit and that the reception report exists. If either is missing, the town hall has nothing to attest.

Matching the permit is the condition that catches most people out. An extra attic room, a window opening moved, or an outbuilding attached to the house all mean that what you built is no longer what was authorised. The Code says a building put up in breach of its permit cannot be received (art. 280(8)), and without reception there is no certificate either. A change not yet built is covered by the amendment permit, requested before the work and only while the building permit is valid (art. 293(2)-(3)); one already built needs a regularisation permit, within the limits of art. 301. What a house without the report means, from the fine to the tax, is explained in a house with no reception report.

Going to court does not get round the conditions. The consolidated version of Law 7/1996 on the official legislation portal notes High Court (ÎCCJ) Decision 13/2019, an appeal in the interest of the law: a missing permit, a breach of it or a missing reception report also stand in the way of a court recognising, in a declaratory action, the ownership of a building the landowner put up with their own materials.

What the town hall asks for at the counter

Neither Law 7/1996 nor the Urbanism Code lists the documents for the application. Each town hall publishes its own list, so what follows is an example, not the rule. The list from the Sector 5 town hall in Bucharest for this certificate (a file from May 2024, consulted on 21 October 2026) predates the Code, in force since 25 August 2026, and may not have been updated. In its own order, it asks for:

  • the application and the owners’ identity documents, plus the title deeds if the owner differs from the one named in the permit;
  • a land register extract for information, less than 30 days old;
  • a copy of the building permit;
  • the reception report at completion and a letter from the local tax department or, where relevant, the report on the physical stage with a finding from the local police;
  • the cadastral surveyor’s report, the site and boundary plan and the measured surveys of every floor, as originals;
  • proof that the regularisation fee has been paid, where relevant;
  • colour photographs of every façade, including the street view.

The list also contains a rule we find neither in Law 7/1996 nor in the Code: if the reception is more than 90 days old on the date of the application, the sector also asks for a finding from the local police and a notarised statement from the owners that nothing has been built since the reception. Worth knowing if you have left the certificate for later.

What it costs

The Fiscal Code sets no fee for the certificate attesting a building. We searched for the phrase in the whole consolidated Fiscal Code, as updated to 8 August 2026, and it does not appear. There is therefore no national amount you can work out in advance.

The payment that usually comes up at this point is a different one: the regularisation of the permit fee. The Fiscal Code requires you to declare the value of the works within 15 days of completion, but no later than 15 days after the permit expires (art. 474(7)(c)). The town hall sets the fee on the real value within 15 days of the final statement being filed (letter (d)), and the difference is paid or refunded within a further 15 days of being notified (letter (e)). That is why Sector 5 asks for the tax department’s letter and the proof of payment. The permit fee rates are on the page about calculating permit fees.

If your town hall still charges an amount for the certificate itself, ask which local council decision it rests on. The Fiscal Code allows local councils to adopt special fees for their services (art. 484), and such a fee is found in the local decision, not in the law.

Without a building permit

The answer depends on the year the house went up. For buildings put up before 1 August 2001, the date Law 453/2001 came into force, registration rests on the tax certificate, which states the real area of the building and of the land and is issued by the local authority where the building stands, together with the cadastral documentation (art. 37(2), as worded by Law 377/2022).

For a house put up without a permit after that date, the law offers no certificate. The certificate attesting a building presupposes a permit that was respected and a reception, and a building with no permit cannot be received. The order is first the regularisation permit, where the Code allows one, then reception, then the certificate. The period in which regularisation can be requested is covered in the one-year regularisation window.

By stages, before the end

The cadastre law also allows an unfinished house to be registered. Article 37(3) asks for three documents: the certificate attesting the stage reached, issued by the mayor, the report recording the stage reached and the cadastral documentation. The report recording the stage also appears in the Urbanism Code, among the documents that may be drawn up before the works are finished (art. 280(6)).

Works under a notification have their own route

For houses built under a notification there is no building permit, and so no issuer of one. The Code settles it directly: registration rests on proof that the notification was sent and on a check of its entry in the National Register of Buildings (art. 298(7)).

The steps, including who makes the entry in the register, are in registering a new house.


This article is analysis, not legal advice. The provisions cited are from Law 7/1996 and from the Fiscal Code (Law 227/2015), in the consolidated versions consulted on 21 October 2026, and from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. The list of documents is the Sector 5 town hall’s and may differ at yours. Romanian legal terms are kept in the original where the translation would lose precision. Check your own situation with the issuing authority.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.

Your certificat de urbanism file, in 30 seconds

AutoRize generates the application, the memoriu de prezentare and the opis for the certificat de urbanism, matched to local planning rules.

Get started