The investment identification board, the panou de șantier every Romanian building site carries, goes up no later than the day works start and stays visible from the public road until they end. Since 26 August 2026 it has a new model, form F_02 in Order 975/2026: at least 60 × 90 cm, a title in letters at least 5 cm high, plus the number of the permit or notification, the design team and the contractor. If it is missing, the fine is a fixed 2,000 lei, though a first offence may get only a warning.
In short
| Question | Answer | Source |
|---|---|---|
| Who puts it up, with a building permit? | The permit holder, no later than the start date of works | Legea 169/2026, art. 278(6) |
| And for notified works? | The beneficiary, when works start | art. 298(5) |
| Which model? | Form F_02, mandatory from the order’s publication | Order 975/2026, annex 4 and art. 3(2) |
| How big? | At least 60 × 90 cm, in weather-resistant materials | F_02, note 1 |
| Where? | In a place visible from the public road, for the whole duration of works | F_02, note 2 |
| What do you risk without it? | 2,000 lei or, for a first offence, a warning | art. 357(1)(h), (4)(g), (6) |
Who puts up the board, and by when
The building permit holder puts up the board, at the latest on the day works start. For works done by notification, the duty falls on the beneficiary, also from the start. Either way the board stays in view until the works are finished, and a missing board is fined on its own, separately from any other problem on the site.
The Urbanism Code (Legea 169/2026) says the same thing in four places. Article 278(6) requires the permit holder to place the board where it can be seen, at the latest on the start date, and leaves its content to a ministerial order. Article 298(5) requires the beneficiary of notified works to place it where it can be seen when building starts. Article 314(7) lists the board among the steps that follow the communication of the permit and precede the start of works, next to the note in the land register and the newspaper notice. And article 514(1)(d) lists it among the developer’s duties before works begin.
The building permit form (F_A_04) repeats the duty at point 7, obligation 9: when works start, the holder puts up the investment identification board in a visible place.
What goes on the board, field by field
Form F_02 has three sections and a picture. Its title starts with Șantier în lucru (site at work) and continues with panou de identificare a investiției / lucrărilor. Whoever fills it in needs the permit or the notification confirmation, the designers’ details and the contractor’s.
1. The permit or notification:
- a ticked box: building/demolition permit or notified works;
- the registration number and date;
- the issuing or receiving authority (the primărie or the county council);
- the identifier in the National Register of Constructions (RNC);
- the construction period in months, the start date and the completion date;
- an overall view: a photo of the model, a 3D perspective or the main façade from the project.
2. The design team, in four columns (lead designer or architecture, structure, building services, other designers or certified checkers). For each: the firm or name, the specialist (architect with signing rights, certified engineer, with the field of certification) and phone and email.
3. The contractor, in two columns: the builder (main contractor or contractor) and the site supervisor (diriginte de șantier) or the contractor’s technical manager (RTE). For each: the firm or name, address, permit or certificate number, phone and email.
Below the form, two notes set the format: the board is made of weather-resistant materials, at least 60 × 90 cm, with letters at least 5 cm high for the title, and it must be placed where it can be seen from the public road for the whole duration of works.
Order 975/2026 makes the models mandatory from the date of publication (article 3(2)), that is from 26 August 2026, and gives each one a code and a version (article 1(2)). F_02 is at version 1.0. The order rests on articles 262 and 578(2) of the Code, not on article 278. Our reading: F_02 is the content that article 278(6) leaves to an order, because it is the only board model approved since the Code took effect, but the order does not say so in terms.
What changed from the old model
The board templates you find online, including those on print shops’ sites, copy annex 8 of the rules implementing Legea 50/1991 (Order 839/2009). The Code repealed that order, together with the law, on 25 August 2026 (article 576(3)(e)). Compared line by line:
| Field | Old model (Order 839/2009, annex 8) | F_02 (Order 975/2026) |
|---|---|---|
| Minimum size | 60 × 90 cm | 60 × 90 cm |
| Letters at least 5 cm high | all the data | the title only |
| Placement | in a visible place | visible from the public road |
| Beneficiary, with address | yes | no field |
| Name and address of the project | yes | no field |
| Notification | no | its own box |
| RNC identifier | no | yes |
| Specialist with signing rights or certificate | no | yes, per discipline |
| Site supervisor or RTE | no | yes |
| Builders per trade (structure, services, envelope) | yes | a single contractor |
Two gaps matter in practice. F_02 has no field for the beneficiary and none for the address of the works: the site is identified by the number of the act and the authority that issued it. And neither the Code nor the permit form asks any more for the identification plaque that old permits required once the works were finished.
The RNC field, before you have an identifier
The Code itself provides for the period until the National Register of Constructions becomes operational, for example by sending the acceptance record to the I.S.C. (article 298(6)). Order 975/2026 only says that the technical details of the identification fields are published on registrulcladirilor.gov.ro (article 2(4)).
What the register is and what goes into it is in the national register of constructions.
Our reading: until you receive an identifier, there is nothing to put in the RNC field, and an empty field is not the offence, because article 357 punishes failing to display the board, not a blank line. Still, ask the primărie how it wants the field filled in the meantime.
The fine, and who imposes it
Failing to display the investment identification board is a contravention (article 357(1)(h)). The fine is a fixed 2,000 lei, the same as for not announcing the start date of works (paragraph (4)(g)). For a first offence it may be sanctioned with a warning instead, once (paragraph (6)). Both the I.S.C. and the control department of the primărie or county council that issues the permits can find the offence (paragraph (9)).
The Code’s other fines, from works without a permit to works that breach it, are on the page about fines for building without a permit.
The board matters to neighbours too. It is one of the publicity steps for the permit (article 314(7)), and the deadlines for challenging the permit depend on that publicity. How they are counted, with the two moments the Code points to, is in annulling a building permit.
Permits issued before 25 August 2026
For permits issued before the Code took effect, the publicity steps in article 314(7) may also be done after works start, says the last sentence of that paragraph. The board is one of them. Our reading: if you started works under an old permit and put up a board on the old model, no rule asks you to replace it, but a board you have made from now on should follow F_02, the only model in force.
Notified works and building without a contractor
For notified works, you tick the notificare lucrări (notified works) box and enter the registration number and date of the notification. If you build without a contractor, where the Code allows it, F_02 has no separate field for that. Our reading: in section 3 put your own name as contractor and, in the second column, the site supervisor.
When notification is possible is covered on the page about simplified notification.
Ordering the board
Ask the print shop explicitly for model F_02 from Order 975/2026 and give it the permit number, the designers’ names with their certificates, and the details of the contractor and the site supervisor. Before printing, check that it measures at least 60 × 90 cm and that the title letters are at least 5 cm high. Put it where it can be seen from the street, not behind the fence, photograph it on the day you start, and keep the photo together with the copy of the start notice sent to the primărie and the I.S.C.
What else to tick off that day is in five things before the first day on site, and the order’s other forms are described in the forms of Order 975/2026.
This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026 (with the rectification in Monitorul Oficial no. 862 of 14 October 2026), and from Order 975/2026 and its annexes, published in Monitorul Oficial no. 711 and 711 bis of 26 August 2026 (forms F_02 and F_A_04). The old model is annex 8 to Order 839/2009, now repealed. Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority.