For years F.1 and F.8 were the only form codes anyone who had filed a dossier knew. Since 25 August 2026, when the Codul urbanismului repealed Ordinul nr. 839/2009 (article 576), they are no longer the legal templates, and since 26 August the new ones are mandatory. Order no. 975/2026 of the Minister of Development, published in Monitorul Oficial no. 711 of 26 August, approves them, and their codes look different: F_CU_04, F_A_01, F_NOT_01.
How to fill in the certificate request and the permit request is on the pages the certificat de urbanism request and the building permit request. This is the map of the whole set: which form belongs to which procedure.
What the order itself says
Four rules from the order’s three articles matter more than any single form:
- the templates are mandatory from the date of publication and apply uniformly across all public authorities (article 3 paragraph (2));
- requests filed before are decided on the forms valid on the filing date (article 3 paragraph (3));
- the forms can be used on paper or digitally, and forms filled in on paper or sent electronically are valid and must be processed (article 2 paragraphs (1) and (2));
- local authorities have until 30 December 2026 to update their platforms and filing interfaces (article 2 paragraph (3)).
The last rule explains why your city hall’s website may still offer the old template. We wrote about that gap between the law and what you find online in the code applies, the rules are missing.
Every form carries a code and a version number on each page, and any change to a template updates the version (article 1 paragraph (2)). All of them are at version 1.0 for now.
Annex no. 1: the certificat de urbanism
Eight forms: four requests, three certificates and a completion annex.
| Form | What it is |
|---|---|
| F_CU_01 | the request for the information certificat de urbanism |
| F_CU_02 | the request for the certificate for cadastral operations |
| F_CU_03 | the request to extend the certificate’s validity |
| F_CU_04 | the request for the building or demolition certificate |
| F_CU_05 | the information certificat de urbanism |
| F_CU_06 | the certificate for cadastral operations |
| F_CU_07_0 | the certificate for building or demolition |
| F_CU_07_1 | the completion annex to the certificate, under article 249 paragraph (3) of the code |
The F_CU_01 to F_CU_04 requests can be downloaded blank, in Word and PDF, from the urbanism certificate request page.
The certificate for subdividing and merging plots has its own forms, with the attachments they ask for, described in the certificate for cadastral operations.
Annex no. 2: permitting
Most of the set is here. F_A_01 can be downloaded blank, in Word and PDF, from the building permit request page.
- F_A_01 is the request for a building or demolition permit, with the technical annex and the annex for properties, and F_A_04 is the permit as issued;
- F_A_02 asks to extend the execution period or the permit’s validity, each by at most 12 months;
- F_A_03 is the sworn statement for avize deemed granted tacitly, the one set out in articles 93, 262 and 269 of the code, which we wrote about in tacit approval;
- F_A_05 and F_A_06 are the request for, and the mayor’s opinion (avizul primarului);
- F_A_07 is the model of the stamp marked vizat spre neschimbare;
- F_A_08 and F_A_09 are the notices that works are starting, to the issuing authority and to the territorial construction inspectorate, and F_A_10 and F_A_11 the notices that they are finished, to the same two; what follows each is in the start and finish notices;
- F_AM_01 and F_AM_02 are the request for, and the modification permit, F_AR_01 and F_AR_02 the request for, and the regularisation permit.
Annex no. 3: the notification
Seven forms for the simplified procedure. Only two are yours: F_NOT_01, the notification, and F_NOT_07, the completion notice, in which you also ask for a representative of the local administrative unit to attend the handover. The rest are the authority’s answers: the confirmation (F_NOT_02), the request for clarifications (F_NOT_03), the notice that the works need a permit (F_NOT_04), the reasoned rejection (F_NOT_05) and the extract on whether the deadline has passed and where the procedure stands (F_NOT_06). Whether your works qualify for the notification is on the simplified notification page.
Annex no. 4: related forms
Six templates with no procedure prefix: the drawing title block (F_01), the site identification panel for the investment (F_02), the reports of offences found, by the local authority (F_03) and by the I.S.C. (F_04), then the request for, and the placement opinion (F_05 and F_06). You will see the first two on any dossier; the title block goes on every sheet of the drawings.
Where it meets the register
Article 2 paragraph (4) of the order says the data in the forms will feed the Registrul național al construcțiilor automatically, with the technical specifications published at registrulcladirilor.gov.ro. The technical annex of F_A_01 has, at point 9, the field for reporting the building to the Registrul național al clădirilor. What the register is and who writes into it is in the Registrul național al construcțiilor.
This article is analysis, not legal advice. Provisions are cited from Order no. 975/2026 of the Minister of Development, Public Works and Administration and its annexes, published in Monitorul Oficial no. 711 and no. 711 bis of 26 August 2026, and from Legea 169/2026. Check your own situation with the issuing authority. Romanian legal terms are kept in the original, because the Romanian text is the one that governs.