The Nordis Law after the Urbanism Code: what remains

The article the Nordis Law wrote was repealed on 25 August 2026, but its rules for homes bought off-plan now sit, almost unchanged, in the Urbanism Code.

Citește în română

The Nordis Law (Legea Nordis, Law 207/2025) set new rules for anyone buying a home in a project that is not yet finished: a pre-sale contract only before a notary, a limited reservation, and an advance kept in a separate account. It wrote them into Law 10/1995 on construction quality. On 25 August 2026 the Urbanism Code repealed that article, but took over the same rules almost word for word. They still apply; they simply sit in a different law now.

What protects you, in short

RuleWhat it means for youWhere it is now
The promise, only after the permitThe developer may promise you the home only once the building permit is noted in the land book and the home has its own land-book entryUrbanism Code, art. 422
The pre-sale contract, only before a notaryIt is signed before a notary, who has it noted in the land bookUrbanism Code, art. 422
The reservationAt most 60 days; the sum paid, at most 5% of the price, or the reservation is voidUrbanism Code, art. 422
The advanceIt sits in a separate project account and is spent in stages, with the bun de plată (approved for payment) stamp of the site supervisor or the responsible personUrbanism Code, art. 422
The developer’s fine1% of the previous year’s turnover, if it uses the advance for another purposeUrbanism Code, art. 422
Land-book entries for flats not yet builtEach flat gets a land-book entry before it is builtCadastre Law, art. 26

Is the Nordis Law still in force?

Its rules are. The article it wrote into Law 10/1995 was repealed on 25 August 2026, when the Urbanism Code (Legea 169/2026) came into force. On the same day the same rules entered article 422 of the Code, so there was not a single day without them. The Cadastre Law part and its transition rules were left untouched.

We compared the sales rules in the two texts word for word. The differences are of form only: one word in the reservation rule, a comma and the numbering of the paragraphs. For you, the rules are the same as in December 2025.

The practical steps, from the reservation to the handover of the keys, are in our article on what the Code requires of a developer.

What did change

The part about the developer changed. Law 207/2025 called a developer only someone who builds blocks or houses to sell them. The Code defines the developer more widely, as anyone who funds and carries out construction works, and gives it a few new duties: civil liability insurance, specifications for choosing the designer and the builder, and registering the building in a national register.

Our reading is that for a buyer this changes little: the sales rules in the table apply, as before, to anyone selling flats or houses that are not yet finished. We have written about the register separately, in the National Register of Buildings.

A land-book entry for flats that do not exist yet

The second part of Law 207/2025 amended the Cadastre Law (no. 7/1996), which the Code did not touch. It lets the block and each flat get a land-book entry before they are built, on the basis of the building permit and a deed signed before a notary. The procedure is called pre-apartmentation (preapartamentare), and for blocks the Code requires it before any promise of sale.

Two things matter for you. Your pre-sale contract appears in your flat’s land-book entry, where anyone checking the property can see it. And if the developer changes the number of flats along the way, the land-book entries are updated without your consent, unless the area or the location of the flat promised to you changes. At the end, after the completion report and the certificate attesting the building’s construction, the entries are completed with the finished building’s data.

The transition rules

Law 207/2025 has one more article of its own, Article IV, which the Code did not repeal. It describes how things worked in the first months, before pre-apartmentation was possible: the permit was noted separately for each flat, and the pre-sale contract was noted with a reference to that entry. On our reading, what counts for today’s projects are the rules in the Code and in the Cadastre Law.

Does your pre-sale contract still cite Law 10/1995?

That is not a problem in itself. For laws and orders, the Code says expressly that references to repealed texts are read as references to the Code (article 583). About contracts it says nothing. Our reading is that the reference to the old article changes practically nothing, because the rules are the same; for a specific contract, ask a lawyer.

Who applies the 1% fine

The Code does not say. The fine for using the advance for another purpose is written in article 422, but no article names the authority that finds the offence. The State Construction Inspectorate is expressly given other fines, not this one, and the general law on minor offences does not apply under the Code, outside two cases that do not concern this fine (articles 357, 571, 581 and 144).

The fine exists, but on our reading the way it is applied is not written down. The practical protection remains the separate account: money from the advance is spent only with the bun de plată stamp of the site supervisor or the responsible person, at most 25% of the price for the structure and, once that is finished, at most 20% for the installations.

What to check before you sign

  1. The land-book extract for your home, with the building permit noted.
  2. That the reservation lasts no more than 60 days and the sum paid is no more than 5% of the price.
  3. That the pre-sale contract is signed before a notary and cites article 422 of the Urbanism Code.
  4. The separate project account you pay the advance into.

What else changed for permit files is on the page about Legea 169/2026.


This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026 (with the rectification in Monitorul Oficial no. 862 of 14 October 2026), from Law 207/2025, published in Monitorul Oficial no. 1133 of 8 December 2025, from Law 10/1995, in its form consolidated on 25 August 2026, and from Law 7/1996, in its form consolidated on 13 July 2026. Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority, and a specific contract with a lawyer.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.

Your certificat de urbanism file, in 30 seconds

AutoRize generates the application, the memoriu de prezentare and the opis for the certificat de urbanism, matched to local planning rules.

Get started