A plot behind another plot is a common situation: your land does not reach the street, and the only way to it crosses the neighbour’s yard. Before any discussion about the house, the question is whether you can get a building permit, because the urbanism regulation ties permitting to the existence of access.
In short: how wide
No law gives a single width for every right of way. The figures that exist are in annex 4 to the General Urbanism Regulation, which article 25 paragraph (3) points to, and they are written for access inside subdivided areas:
| Situation | Minimum width | Where it is written |
|---|---|---|
| (Semi-)driveway lane to houses, up to 25 m long | 3.5 m | annex 4, point 4.11.1 |
| The same lane, longer than 25 m | passing places and a turning area | annex 4, point 4.11.1 |
| Dead end to the back plots, 30 m | one 3.5 m lane | annex 4, points 4.11.1 and 4.11.2 |
| Dead end up to 100 m | two lanes, 7 m in total, pavement on at least one side, turning area at the end | annex 4, points 4.11.1 and 4.11.2 |
| Passage into an inner courtyard, for fire engines | 3 m wide, 3.5 m high | annex 4, point 4.12 |
| Servitude agreed between two neighbours | whatever the agreement or the court ruling says | Civil Code, art. 619 |
The local urbanism regulation for the area may set its own access requirements, and the planning certificate tells you what applies to your plot. The rest of this article explains where the figures come from and when the town hall will apply them to a servitude.
The rule: direct access or access through a servitude
The General Urbanism Regulation (Government Decision 525/1996), in article 25 paragraph (1), allows building works to be permitted only if there is a way to reach public roads, directly or through a servitude, suited to the building’s use. The same paragraph requires the access to allow fire engines to intervene.
So a plot with no street frontage is not unbuildable by definition. It needs a right of way, that is a right to cross someone else’s land, and that access must be adequate for the building you want.
Paragraph (2) allows an exception: exceptionally, a building can be permitted without these conditions, with the opinion of the territorial fire brigade. The exception exists, but it is the fire brigade’s decision on your case, not a general loophole.
The Urbanism Code says the same from the land’s side. Article 159 paragraph (1) calls buildable the plots that, among other things, have direct access to public roads or indirect access through legally constituted rights of way. Those are the words that matter: a crossing the neighbour merely tolerates is not one.
How the right of way arises
The Civil Code covers the situation in articles 617-620.
| What it says | Article |
|---|---|
| An owner with no access to the public way has the right to be allowed to cross the neighbour’s land | 617 para. (1) |
| The crossing causes minimal disturbance; if several neighbours have road access, it goes over the land that suffers least | 617 para. (2) |
| The right of way does not lapse with time and ends when another access appears | 617 para. (3) |
| If the lack of access comes from a sale, exchange or partition, the crossing is claimed from those who acquired the land previously crossed | 618 para. (1) |
| If the lack of access is your own doing, the crossing can be set only with the neighbour’s consent and at double compensation | 618 para. (2) |
| The extent and manner of the crossing are set by agreement, court ruling or 10 years of continuous use | 619 |
| Compensation received is returned, less the damage suffered, if the right of way ends | 620 para. (2) |
The fourth row matters when land is divided. When you split a plot and leave part of it landlocked, the code sends the crossing to whoever bought the part you used to cross, not to any neighbour. The urbanism certificate needed for a split is covered in split or merge: the certificate you need.
How wide the lane must be
Article 25 paragraph (3) of the regulation sends the number and layout of accesses to annex 4, which gives widths by building type. For single-family houses with their own access and plot (point 4.11.1), the annex requires vehicle access for residents and vehicle access for waste collection and fire-fighting equipment, and driveway or semi-driveway lanes inside subdivided areas, up to 25 m long, are at least 3.5 m wide. Beyond 25 m, passing places and turning areas are required.
For subdivisions laid out in two rows, the back plots are reached through local service lanes, called dead ends. One of 30 m has a single 3.5 m lane. One of up to 100 m has at least two lanes, 7 m in total, with a pavement on at least one side and a turning area at the end.
The same dead ends, with the same widths, appear for semi-collective housing on a shared plot (point 4.11.2), where the long version is written as a dead end from 30 m up to a maximum of 100 m.
Point 4.12 adds, for all buildings, access for fire-fighting, sized for heavy traffic, which must be kept clear at all times. If the fire engines’ access runs through a passage into an inner courtyard, the passage is at least 3 m wide and 3.5 m high.
These figures are written for lanes in subdivided areas. A servitude between two neighbours does not automatically become a 3.5 m lane, and its width is set by agreement or by a court (article 619 of the Civil Code). So if you negotiate the servitude before the design, it is worth negotiating it at the width the house will need, not the width of a footpath. But when the servitude is the house’s only access, the town hall will read it by the same criteria, because article 25 requires access suited to the use and reachable by fire engines. That is our reading, not a written rule.
What you need in the file
A servitude is a property right, and its checkable trace is in the land book of both plots. A verbal understanding with the neighbour proves nothing to the town hall. Access on the plot also appears in the design: the Urbanism Code, in article 250 paragraph (2) letter c), requires the issuing authority to consider pedestrian and vehicle access on the plot. You will draw it on the site plan.
And if the access joins a public road, article 25 paragraph (4) of the regulation requires the opinion and the special building permit of the road’s administrator. The full list of opinions for your case comes through the urbanism certificate, described on the page about approvals for the building permit.
Where to start, in practice
Get the land book extracts for your plot and for the plot you cross, and look for the servitude registered in both. If it is missing, there are two routes: an agreement with the neighbour, concluded before a notary and registered in the land book, or a court action under articles 617-619. Only then is it worth ordering the design. The order of the steps, on the code’s deadlines, is in the order of the steps.
The regulation’s rules still apply, under article 583 paragraphs (1) and (2) of the Urbanism Code; we explained why in how close to a neighbour you can build.
This article is analysis, not legal advice. The provisions cited are from the Civil Code (Law 287/2009), from the General Urbanism Regulation (Government Decision 525/1996, republished form) and from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Check your own situation with the issuing authority.