The site supervisor (diriginte de șantier) works for the beneficiary or the developer and checks the correct execution against the technical documentation. The technical execution manager (responsabil tehnic cu execuția, RTE) works for the builder and ensures the quality of the execution they coordinate. The Urban Planning Code (Legea 169/2026) does not say who pays them; normally the party they work for pays. From what I read, it does not say directly either that a house needs a site supervisor, and I found no house exemption.
In short: the supervisor and the RTE side by side
| Question | Site supervisor | RTE |
|---|---|---|
| Who they work for | Employee or contractor of the developer or the beneficiary, independent of the other parties involved (art. 454 para. (2)) | Employee or contractor of the contractor (art. 457 para. (2)) |
| Who pays them | The Code does not say; in practice, normally the party they work for | The Code does not say; in practice, normally the party they work for |
| Their role | Checks that the works are executed correctly against the technical documentation, throughout the works (art. 454 para. (1)-(2)) | Ensures the quality of the execution he or she technically coordinates (art. 457 para. (1)) |
| Who authorises them | ISC, which also confirms them periodically (art. 382 para. (2), art. 454 para. (4)) | ISC, which also confirms them periodically (art. 382 para. (2), art. 457 para. (3)) |
| Must stop the works | Yes, after a technical accident or deviations from the technical regulations or the design, notifying ISC within 24 hours (art. 456 para. (1) lit. d)) | Yes, after a technical accident or deviations from the technical design for execution, notifying ISC within 24 hours (art. 459 para. (1) lit. g)), and on non-conformities that can affect quality (lit. f)) |
| Fine if missing | Failing to have the execution checked by authorised supervisors: fine of 20,000 to 50,000 lei (art. 570 para. (1) lit. n), para. (2) lit. b)) | Building without an authorised RTE: the same fine (art. 570 para. (1) lit. o)) |
Who hires whom
The supervisor stands on the beneficiary’s side and the RTE on the builder’s. The first works as an employee or contractor of the developer or the beneficiary, throughout the works, and must be independent of the other parties involved (art. 454). The second is an employee or contractor of the contractor (art. 457). The Code does not say who pays either of them, but normally it is the party they work for.
On the contract with the builder, see the building contract for a house.
Must you hire a site supervisor?
From what I read, no sentence in the Code says directly that the owner of a single-family house must hire a supervisor, but I found no exemption for houses either. The duty is written for the developer, and the fine is written without visible exceptions. The prudent reading is to treat a supervisor as the rule for anyone who builds. Whether it applies to your house is for ISC to answer, not this article.
The law does not give the answer in a single sentence, so below I separate what the text says from what it does not say.
What the Code says:
- The developer must ensure that the correct execution is checked by authorised site supervisors throughout the works (art. 422).
- Monitoring the execution is mandatory, among others, by the developer, permanently, through the site supervisor (consultant), and by the contractor through the RTE (art. 520).
- Failing to have the execution checked by authorised supervisors is a contravention, fined 20,000 to 50,000 lei for individuals and companies. The same fine applies to building without an authorised RTE. ISC carries out the checks (arts. 570 and 571).
What it does not say, from what I read:
- The duty in arts. 422 and 520 is written for the developer.
- I found no exemption for houses, for class CC1 or for self-build. The design-check exemption in art. 440 concerns the design. The execution falls outside it.
- A developer is whoever finances and carries out the works, and any beneficiary may hold that capacity by taking over in full the project-management duties (art. 422). The text does not say whether someone building a single house for themselves falls into it. For a beneficiary who is also the developer, the Code mentions contracting specialists according to the specifics, scale, difficulty and consequence class, with no house-specific rule (art. 420).
- The supervisor does not appear in the notification procedure (arts. 294-299) or in annexes 2, 3 and 5 with the dossier documents. Annex 1 mentions the role only in the definition of the works statement. A contract with a supervisor is not filed at the counter, so a gap would only show at inspection.
Still, some articles assume a supervisor exists: the site handover (art. 515) and the handover of the technical book (art. 528) go through them. For self-build I also found no express rule on who stands in for the RTE, which in the Code belongs to the contractor.
How to check they are authorised
Both are authorised by the State Inspectorate in Construction (ISC), which also confirms their right to practise periodically. ISC keeps a public register of supervisors and another of RTEs, published on its website, so you can check the person before you sign (art. 572 para. (11)).
The right to practise is granted for an indefinite period and confirmed periodically. The conditions are set by order of the competent minister (arts. 455 and 458). Practising outside the validity period leads to suspension by operation of law (art. 572 para. (6)).
For works on listed historic monuments, supervisors and RTEs need an additional authorisation in monument protection (arts. 454 and 457).
What each one does on site
Both take part in continuous checking, including the determining phases of the quality-control plan, keep an electronic activity register and take out professional liability insurance. Both stop the execution after a technical accident or deviations from the design and notify ISC within 24 hours (arts. 456 and 459).
On insurance, see compulsory insurance. This stop is a technical one, separate from the one ordered by the authorities, described in your site has been stopped.
The supervisor also has these tasks:
- draws up non-conformity reports when the work does not match the design and sends them to the designer for resolution (art. 456);
- hands the site over to the contractor, for the beneficiary or developer, against a handover record (art. 515);
- checks and approves the execution schedule and reports monthly to the beneficiary (art. 526);
- acts as secretary of the reception committee, draws up the reception documents and the technical book of the building, and hands the book to the owner at reception (arts. 456 and 528);
- coordinates updating the technical book during execution (art. 530).
The RTE checks the execution sheets and procedures from the design, stops the works on finding non-conformities that can affect quality and gives the developer the execution documentation for the technical book (art. 459). How the technical book is closed is in the electronic technical book, and the reception the supervisor prepares is on the page about reception on completion of works.
Incompatibility
The supervisor’s activity is incompatible with any design, execution, verification or expertise work on the project where he or she acts as supervisor (art. 454).
ISC may authorise the same person as both supervisor and RTE. That person practises either profession depending on the contracts involved, subject to the incompatibility rules (art. 459). The text does not spell out those rules; the rule above shows at least that a project’s supervisor cannot also execute or verify on it. More on how the Code defines independence in independence, defined by what you may not do.
What to ask before you sign
- Is the supervisor hired by you, as in art. 454, or brought in by the firm doing the work?
- What is the name in the public ISC register, and which fields is it authorised for?
- What does the contract say: how many visits, which determining phases, who receives the non-conformity reports?
- Who is the builder’s RTE, and is the insurance in place?
The dossier documents for the permit, where neither of them appears, are on the page about the building permit. Who signs the design, the stage before the site, is in who signs the design.
This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Romanian legal terms are kept in the original where no exact English equivalent exists. Check your own situation with the issuing authority.