The Lift pentru viață (“Lift for life”) programme was created by Legea 153/2026, published in Monitorul Oficial no. 592 of 20 July 2026 and in force 30 days later. The town hall installs lifts, platform lifts or ramps in blocks of flats with at least three storeys above ground that were built without a lift, provided an elderly person, someone with reduced mobility or a locomotor disability, or a family with a young child lives above the ground floor of the staircase. The works are paid for with EU funds, state money or the local budget. The owners’ association signs a mandate contract and then pays for upkeep. The first stage covers at most 100 blocks, two in each county seat and in each Bucharest sector.
Legea 153/2026 in one table
| Question | What the law says | Where |
|---|---|---|
| Which blocks qualify | Condominiums with 3 or more storeys above ground, with no lift in the original design, including those in protected built-up areas | art. 1(2) |
| Which blocks are excluded | Listed historic monuments (or those being listed) and blocks rated seismic risk class RsI or RsII | art. 1(3) |
| Who must live on the staircase | At least one elderly person, person with reduced mobility, person with a locomotor disability, or a family caring for a nursery or pre-school child, above the ground floor | art. 13(1) |
| Who carries out the works | The town hall (the local administrative unit) | art. 2, art. 13(1) |
| What the association signs | A mandate contract, a general-meeting decision (two thirds, art. 51 of Legea 196/2018) with the owners’ written consent, the list of owners on the staircase | art. 7(3), art. 15(2) |
| Who pays for the works | EU funds, the state budget (non-repayable), the local budget (non-repayable if the local council so decides) | art. 5, art. 7(1) |
| Who pays for upkeep | The owners’ association, split between the owners | art. 20(4) |
| Who owns the lift | The owners, in undivided shares; the town hall, if it stands on the land next to the block | art. 20(1)-(2) |
Which blocks can join Lift pentru viață
The law applies to blocks with three or more storeys above ground that had no lift in the original design, and the text expressly includes blocks in protected built-up areas (art. 1(2)). Two categories are excluded: blocks listed or being listed as historic monuments, and blocks rated seismic risk class RsI or RsII by an expert report (art. 1(3)). For the latter the law leaves another route: a lift can be built as part of the strengthening works under the national programme for high seismic risk buildings, under Legea 212/2022 (art. 1(4) and art. 23).
A missing lift is not enough. Somewhere above the ground floor of that staircase must live at least one of the following: an elderly person, a person with reduced mobility, a person with a locomotor disability, or a family caring for a nursery-age or pre-school child (art. 13(1)). The law does not say at what age someone counts as an elderly person; that is one of the points the implementing rules may settle.
At enrolment, in both stages, three priority criteria count (art. 13(2)): how many people from the categories above live in the block, how tall the block is, and when it was built. On the last one, buildings designed after Normativul nr. 23/IX of 15 June 1978 came into force have priority. Separately, the ministry selects the applications it receives from town halls in chronological order, within the year’s budget (art. 9(2)), so how quickly the town hall files also matters.
Who does the works, and with what money
The association does not hire the builder. The town hall runs the programme, called the beneficiary in the law, and the construction and installation of lifts is its job (art. 2 and art. 13(1)). If the association asks, the town hall also prepares the simplified technical documentation, per staircase or for the whole block (art. 15(3)).
The money comes from EU housing funds, from the state budget through the Ministry of Development, from local budgets and from donations or sponsorship (art. 5(1)). EU funds have priority for the first 18 months (art. 5(4)). State money is non-repayable (art. 7(1)), and the town hall’s own contribution can be declared non-repayable by a local council decision (art. 7(2)). The law asks no contribution from the owners towards the works. Nor does it say what happens to local-budget sums the council does not declare non-repayable.
The programme runs in two stages (art. 12(1)):
- The pilot, 18 months from the law’s entry into force: at most 100 blocks, two in each county seat and two in each Bucharest sector.
- The roll-out to all eligible blocks, run by town halls and paid from the state budget or EU funds, within the money approved each year (art. 12(2)(b)).
If your block is not picked for the pilot, the association can ask the town hall to do the works from its own budget (art. 12(3)). Town halls may also run their own programmes, from the local budget, for blocks outside the national programme (art. 1(5)).
Once installed, the lift belongs to the owners in the block, in undivided shares (art. 20(1)). If it is built on the land next to the block, it belongs to the town hall (art. 20(2)). The association has the right to use the lift for the owners’ benefit (art. 20(3)). Either way, operation, maintenance and inspections are paid by the association and split between owners under article 75 of Legea 196/2018 (art. 20(4)).
What the owners’ association signs
The town hall acts under a mandate contract with the owners’ association (art. 7(3)). If the block has no association, the mandate is given by two thirds of the flat owners and two thirds of the owners of non-residential units. Through this contract the association authorises the town hall to decide the measures needed for the programme (art. 7(4)).
The application filed with the town hall has three parts (art. 15(2)):
- the signed mandate contract;
- the general meeting’s decision to join the programme, adopted under article 51 of Legea 196/2018, with the name list showing the owners’ written consent;
- the list of owners on the staircase where the works take place.
Article 51 of Legea 196/2018 requires, for modernisation works, the consent of two thirds of the total number of owners. Legea 153/2026 does not require unanimity. Which other consents the owners’ association law requires for works in a block is covered in neighbours’ consent: when a building permit needs it.
The permit: what the law said and what changed on 25 August
Installing the lift needs a building permit, but on simplified documentation: an architectural statement, a survey of the existing building, elevations, the proposed position of the equipment and its services, a technical expert report on the space affected and, if the lift stands outside the building, a foundation plan and a geotechnical study (art. 15(4)). Legea 153/2026 added three concessions, resting on Legea 50/1991, which the Urbanism Code repealed on 25 August. On our reading the first two carry over to the Code and the third does not:
| Concession | Where | What it refers to |
|---|---|---|
| The permit is issued without the fees set by the Fiscal Code | art. 21(1) | Legea 50/1991 |
| The permit is issued without a title deed, a cadastral plan extract or a land book extract, for works on common parts or on the public land next to the block | art. 21(2) | Derogation from art. 1 and art. 7(1)(b) of Legea 50/1991 |
| The permit is issued without urban planning documentation, for blocks with more than 3 storeys above ground, provided, among other conditions, that the use does not change and the design meets accessibility rules | art. 22 | Inserts a paragraph (5) into art. 2 of Legea 50/1991 |
Legea 153/2026 came into force 30 days after publication (art. 26), on 19 August 2026. The Urbanism Code (Legea 169/2026) came into force on 25 August 2026, 15 days after publication (art. 575(1)), and repealed Legea 50/1991 together with its amendments and additions (art. 576(3)(b)). The two dates are six days apart.
For the first two concessions the Code has a bridging rule: where a special law refers to provisions the Code has repealed, the reference is deemed to be to the Code (art. 583(3)). Article 262(1)(b) of the Code asks for the land book and cadastral extracts unless the law provides otherwise. Our reading is that the fee waiver and the waiver of the title deed and extracts both stand, now referring to the Code, on the strength of article 583.
The third concession is built differently. Article 22 does not refer to Legea 50/1991; it added a paragraph to it, and the Code repealed that law together with its additions. On our reading, the exemption from urban planning documentation went with Legea 50/1991, six days after Legea 153/2026 took effect. The Code has its own list of works that need no new urban planning documentation, in article 252, and lifts and accessibility works are not on it. Letter a) covers alterations provided the same use, built footprint and volume are kept. A lift installed inside the stairwell probably fits there. An external lift adds a volume next to the block, so it probably falls under the general rule: the works are carried out on the basis of planning rules existing or amended for the investment in question (art. 252, opening words). If the local regulation does not allow the new volume, the rules must be amended through urban planning documentation. It is worth asking the town hall before the design starts.
For ramps, the Code probably has a lighter regime: access ramps for persons with disabilities are on the list of works that can be done on a notificare (art. 294(4)(k)). What a notificare is and what you file is on the simplified notification page.
What still has to be published
The law does not run by itself. The Ministry of Investment and European Projects approves, by order, the funding mechanism for the pilot, and the Ministry of Development approves the implementing rules, each within 90 days of the law’s entry into force (art. 25). By our count that deadline falls on 17 November 2026. The rules set the application form and the documents to file (art. 9(1)), and the online platform through which town halls apply opens after the programme is included in the state budget law (same paragraph).
Town halls with blocks of three or more storeys and no lift must list them within 6 months of the law’s entry into force, that is by February 2027, and send the data to both ministries (art. 16(1)). The list is organised, as a rule, by height, period of construction and structural type (art. 16(2)).
Until the rules appear, the association can prepare what is in its hands: check whether someone from the categories in article 13 lives on the staircase, call the general meeting for the decision to join, and ask the town hall whether the block is on its list. If the block has an expert report rating it RsI or RsII, the conversation is different: the lift can only come with the strengthening works or after them (art. 23, which supplements Legea 212/2022), and what the risk class means for the permit is in seismic risk class and the permit.
The full text of the law is on the Portal legislativ.
This article is analysis, not legal advice. The provisions cited are from Legea 153/2026, published in Monitorul Oficial no. 592 of 20 July 2026, Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026 (with the rectification in Monitorul Oficial no. 862 of 14 October 2026), and Legea 196/2018 (consolidated form of 19 December 2025). Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority.