The three regimes for a fence, repair, a replaced fence and a brand-new one, are on the page about works without a permit and I do not repeat them here. The questions left once you have read it are different: how tall the fence can be, who pays for one on the boundary between two plots, and which drawings it needs. The Urban Planning Code (Legea 169/2026) answers only half of them. The rest sits in the Civil Code and in local regulations.
What the Code calls a “fence”
Annex 1, the one with the definitions, describes fences (împrejmuiri) as permanent or temporary structures that delimit areas or plots in which ownership rights exist, built as protection against intrusion. The materials listed are concrete, brick, stone, timber and metal, including barbed wire stretched on stakes, or specific plantings.
Three useful things follow from the definition:
- A temporary fence does not fall outside the term. If it escapes the permit, that shows in articles 294 and 299, not in the fact that it is temporary.
- A hedge is unclear. The definition mentions plantings only as a line along which barbed wire is stretched, and a fence has to protect against intrusion. The General Urbanism Regulation names hedges among the fences that can be authorised (art. 35 para. (1) lit. b)), but does not say whether planting one is construction work. If you want to plant a hedge on the boundary, ask through the urbanism certificate.
- The definition contains no height.
The Code does not give the height
The text of Legea 169/2026 and its annexes contain no maximum height for a fence. Neither annex 1 nor the articles on permitting give a figure. The answer comes from three sources, in the order in which they matter.
1. The local urban planning regulation. Article 294 para. (2) lit. b) point (i) allows a new fence, raised by demolishing the old one, only in line with the applicable urban planning rules. And a permit is issued only if the works fit the urban planning rules in force (art. 259 para. (5)). Height, material and transparency are therefore set by the general urban plan, the zonal plan or the local regulation, and the information-only urbanism certificate tells you those of your plot. The page on the information-only urbanism certificate shows how to request it.
2. The General Urbanism Regulation (Government Decision 525/1996). Decisions adopted under repealed laws still apply if they do not contradict the Code (art. 583 para. (1)-(2)); the mechanism is explained in the forms changed, the websites did not. Article 35 admits two categories of fence: opaque ones, for protection against intrusion, for separating functional services or for visual protection, and transparent, decorative or hedge-type ones, for delimiting plots and fitting the character of the street. Their appearance is held to the same requirements as the exterior appearance of a building. It gives no figure.
3. The Civil Code, art. 662 para. (2). Here is the only height in the texts cited: if no legal provision, no urban planning rule and no local custom says otherwise, the height of the shared wall is set by the parties, but may not exceed 2 metres, the coping included.
So 2 metres is not the limit for any fence. It is the default ceiling for a shared wall between two neighbours, and applies only when no other rule exists. For another kind of divider, such as a mesh or timber fence, the text says nothing. A fence on the street side, or your own fence on your own land, is measured by the local regulation.
A fence on the boundary is, as a rule, shared
The Civil Code starts from a presumption. A wall, a ditch and any other divider between two plots are presumed to be jointly owned by the neighbours, unless something else follows from the title deed, from a sign of non-community or from adverse possession (art. 660 para. (1)). Signs of non-community can be seen on site: a wall whose top is straight and square to one plot and slopes toward the other belongs to the owner toward whom it slopes, and other signs that one party built it alone can count the same way (art. 661).
A few practical rules follow from the presumption:
- Either neighbour can oblige the others to contribute to building a shared divider (art. 662 para. (1)).
- Upkeep and repair are shared in proportion to each party’s right. A co-owner can give up their right in the divider and escape the costs, but not if they have a structure resting on it or draw another benefit from it (art. 663).
- Whoever wants a taller fence than the shared one pays alone for the part above it. If the wall cannot take it, they rebuild it entirely, taking the needed thickness from their own land, and the neighbour can become a co-owner by paying half of the materials and labour and, where relevant, half of the value of the land used for the thickening (art. 665).
A building permit settles none of this. It answers whether the work is allowed under urban planning rules. Who pays and whose the fence is stays between neighbours. Where exactly the boundary lies is covered in how close to a neighbour you can build: start from the boundary in the cadastral documents, not from the old fence.
A fence is allowed where a building is not
Annex 1 defines two zones where nothing is built: the strip between the alignment (the line between private property and the public domain) and the set-back façade of the building, and the strip between the buildable area and the plot boundary. Both are non aedificandi, with exceptions that include fences, accesses and terraces raised by at most 0.45 m (first definition) or 0.40 m (second) above the ground as it was before the works.
A mandatory set-back from the street or from a neighbour therefore does not, by itself, forbid the fence. The local regulation and the neighbour’s rights remain. The two definitions give different figures, as printed in the Official Gazette; for a terrace, check what the local regulation says. On terraces, steps and retaining walls, see retaining walls and access steps.
Which opinions you are spared
If the fence needs a permit, two opinions are not required for it: the public-health services’ opinion (art. 267 para. (2) lit. c), except where a law requires a health-impact study) and the environmental authority’s act (art. 268 para. (2) lit. d)). Other opinions may remain, depending on the site, for example in a protected zone. The urbanism certificate lists them. Which opinions such a zone needs is in what opinions a protected zone requires.
Which drawings a fence needs
When the fence is raised together with a new house, it usually has no separate permit and goes into the house file:
- Annex 2, point 1.2 asks that the existing-situation site plan show existing fences, and point 1.3 asks for the outline of the fence on the proposed plan. The memorandum in the architecture design (point 1.4.2 lit. c) and j)) lists fences among the technical solutions and the relations with neighbours.
- For a rural single-family house of at most ground floor plus attic and 150 sqm built area, annex 3 asks for a fence design as its own piece (point 1 lit. f)), with the fence plans, materials, colours and niches for technical equipment (point 8 lit. c)).
For a fence on its own, the text I read gives no separate list of pieces. What the council asks in your case is written in the urbanism certificate. What the file costs and how the fee is calculated is on the fees page.
If the fence goes through a notification, the design is drawn up with the participation of an architect with the right to sign (art. 264 para. (8)). The work is done without technical verification, responsibility for the design’s correctness resting with the design team, and with an investment identification board in a visible place (art. 298 para. (2) and (5)).
The order in which to check
- What are you doing: repairing, replacing or raising a new fence? The regime is on the page about works without a permit. Even a repair done with no formality ends with a completion acceptance (art. 299 para. (5)). In a monument protection zone or a protected built-up zone, for a building that is not a listed monument or of architectural value, repairing a fence goes through notification, with the culture service’s written consent (art. 294 para. (3) lit. f)). Art. 284 para. (3) lit. f) lists the same repair among those that can be done without a permit, so the two texts do not line up; ask the council which applies.
- What does the zone allow in height, material and transparency? Request the information-only urbanism certificate.
- Is the fence on the boundary? Then it is, as a rule, shared: agree the height with the neighbour (for a shared wall, the default ceiling is 2 m) and who pays, before you spend.
- If it needs a permit, add the fence to the site plan and the memorandum. If the work was not allowed, the consequences are on the page about fines for building without a permit.
This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026, from the Civil Code (Legea 287/2009) and from the General Urbanism Regulation (Government Decision 525/1996). Check your own situation with the issuing authority.