Does unpermitted construction time out? What the Code says

How long until an unpermitted building is time-barred: the Code sets no period for the article 357 fine. Periods of 10, 5 and 3 years remain for other routes.

Citește în română

The Urban Planning Code (Legea 169/2026) sets no limitation period for the fine of 50,000 to 1,000,000 lei for building without a permit. The three years from the day the house was finished came from Legea 50/1991, repealed on 25 August 2026. Periods remain for other routes: 10 years for the court action after an ignored contravention report, 5 years for the I.S.C. fine and 3 years for criminal liability, where the deed is a crime.

How long until it is time-barred, in brief

What can happenPeriodRuns fromWhere it says so
Fine for building without a permit, 50,000 to 1,000,000 leiThe Code sets noneParagraph (7) points to a period that does not existLegea 169/2026, art. 357(1)(b), (4)(b), (7); art. 581(3)
I.S.C. fine for building in breach of the permitting rules, 50,000 to 100,000 lei5 yearsThe date of the deedLegea 169/2026, art. 570(1)(a), (2)(a); art. 571(2)
The authority’s court action for demolition or compliance, after you ignored the contravention report10 yearsThe actual completion of the worksLegea 169/2026, art. 357(10)-(11); art. 358(3)
The mayor’s action to demolish buildings that were not regularised30 days, within which the mayor must file the claimThe end of the one-year regularisation windowLegea 169/2026, art. 301(12)-(13)
Criminal liability: monument, protected zone, carrying on after a stop order3 years; with interruptions, at most 6 yearsThe date of the offence; for a continuing offence, the date it endsLegea 169/2026, art. 356(1); Criminal Code, art. 154(1)(e), (2), art. 155(1), (4)
Regularisation permit for buildings outside the permanent list (P/P+1 houses up to 150 sq m, annexes, balcony enclosures)At most 1 yearThe Code’s entry into force, 25 August 2026Legea 169/2026, art. 301(7)
The old rule, for the fine3 years, repealedThe actual completion of the buildingLegea 50/1991, art. 31; repealed by Legea 169/2026, art. 576(3)(b)

The fine: the Code took over the rule, not the period

The Code took over the High Court’s rule on when the period starts, but not the period itself. Carrying out works without a permit or in breach of it is fined from 50,000 to 1,000,000 lei (art. 357). For this fine, the new text sets no duration at all.

Paragraph (7) of the same article takes over the solution of the High Court of Cassation and Justice almost word for word. For a building that has all the structural elements needed to be considered finished on the date the contravention is established, the period provided in paragraph (5) runs from the date of its actual completion.

That cross-reference leads nowhere, because paragraph (5) has no period. It adds a fine of 50,000 to 500,000 lei for each unauthorised storey where the height regime in the building or modification permit is not respected. The rest of the article contains no limitation period for the fines in paragraph (4) either. We read article 357 to the end and searched the whole Code for the phrase se prescrie (“is time-barred”). It appears twice: for the court action in the same article and for the I.S.C. fines in article 570 (art. 571).

The general contraventions law does not fill the gap

Government Ordinance 2/2001, the general law on contraventions, has its own limitation period. The Code excludes it expressly: in applying the Code, the provisions of the ordinance do not apply (art. 581(3)).

There are two exceptions, and the fines in article 357 fall under neither. The first applies the ordinance to the contraventions on urban planning documentation in article 144. The second departs from article 13 of the ordinance only for the fines in article 570, with its own 5-year period (art. 571).

The wording of that second exception, by derogation from art. 13 of the ordinance, assumes the ordinance would otherwise apply. That is an argument against the reading below. The text that excludes it, however, remains general.

In two earlier pieces on this blog we wrote that, without a period in the Code, the general period of Ordinance 2/2001 applies. We had missed the express exclusion, and we have now corrected both.

Our reading: on the letter of the Code, the fine for building without a permit has no limitation period. How courts will treat a fine applied many years after a house was finished remains to be seen. The Code has applied since 25 August 2026 and we know of no judgment that settles the point. Nor does the Code have a transitional rule on fines for buildings finished before 25 August 2026: in articles 575-584, contraventions appear only in article 581. Whether a house actually finished more than three years before that date can still be fined under the new rules is a question the text does not answer.

For balconies, the ministry has since given another reading. Order 1389/2026, published on 6 November 2026, says the fine for a balcony enclosed without a permit lapses 3 years after the work was finished, under contravention law and building discipline rules, without naming the act. An order does not change the Code. What it means for balconies is in Order 1389 and the balcony enclosed without a permit.

Where the three years came from

The three years came from Legea 50/1991. The right to establish the contraventions and apply the fines in article 26 was time-barred 3 years after the deed (art. 31).

The High Court of Cassation and Justice settled the starting point in an appeal in the interest of the law: for a building that, on the date of the inspection, had all the structural elements needed to count as finished, the period ran from its actual completion.

Hence the formula that still circulates: three years after the house is finished and you can no longer be fined. It describes a law that has not applied since 25 August 2026, when the Urban Planning Code repealed Legea 50/1991.

The court action: 10 years, after the contravention report

The 10-year period covers a narrow situation: the authority’s court action after you failed to comply with the contravention report. The right to bring it is time-barred 10 years after the actual completion of the works.

After fining you, the inspecting body orders measures: bringing the works in line with the permit, a regularisation permit, or demolition (art. 358). If you do not comply within the deadline in the report, the body that applied the sanction goes to court. It can ask for the works to be brought in line with the permit or demolished. The Code adds regularisation and sends the case to the administrative court (art. 357(10)).

The period does not make the building lawful, and it does not apply to the fine. What the contravention report looks like and what follows it is on the page about fines for unpermitted construction.

The I.S.C. fine: 5 years from the deed

For this fine the Code does set a period. The right to establish the contravention and apply the fine is time-barred 5 years after the deed (art. 571).

The contravention is putting up a new building or carrying out an intervention, or a demolition, in breach of the rules on permitting and execution (art. 570). The fine is 50,000 to 100,000 lei.

The Code does not say how to choose, for the same building, between the fine in article 357 and the one in article 570. We flagged the same problem for an old house demolished without a permit.

Criminal liability: 3 years

Where building without a permit, or carrying on with stopped works, is a crime, criminal liability is time-barred after 3 years. With interruptions, the period counts as met after 6 years at most.

Building without a permit becomes a crime at historic monuments, in their protection zones, in protected built areas, at buildings of special architectural or historic value set by urban planning documentation and in the special-character zones of article 184. Carrying on with works after the inspecting bodies stopped them is a crime too, as is breaking the seals (art. 356). The penalty is 3 months to a year in prison or a fine.

The Criminal Code (art. 154) sets a 3-year limitation period for criminal liability for offences punishable by up to one year in prison or by a fine. It runs from the date of the offence and, for continuing offences, from the date the act ends. Any procedural act that the law requires to be communicated to the suspect or defendant interrupts it. However many interruptions occur, the period still counts as met once it has been exceeded by the same length again, that is after 6 years (art. 155).

How the deed is classified in a given case is for the judicial bodies to decide. Where the line between contravention and crime runs is covered in where criminal liability begins.

Time passing does not make the building lawful

None of the periods above turns the building into a permitted one. The way to legalise it is the regularisation permit (art. 301).

On a permanent basis it can be issued only for single-family houses with a ground floor, or ground floor plus one storey, of at most 150 sq m of gross floor area, for annexes and for balcony enclosures, under the conditions the Code sets. For other buildings there is a window of at most one year from the Code’s entry into force. After it, the Code requires the demolition of works carried out without a permit (art. 358). The local authorities may then demolish the unauthorised works and recover the costs or, as the case may be, must ask the court for demolition. The mayor files the claim within 30 days of the end of the window.

The conditions and steps are on the page about the regularisation permit, and how the window is counted is in the one-year window for regularisation.

Limitation appears in the Code in another sense too, in Annex 1, the one with the definitions. An existing building there is a building accepted at completion of works, or one entered in the land register after the limitation periods were met. Those periods are not in the Urban Planning Code, and the definition says nothing about fines. Which documents registering a house without a permit takes is in the certificate attesting construction.

What to settle before relying on a period

  • The date of actual completion. It matters for the 10-year action and, under the old rule, for the fine. Keep dated evidence: invoices, contracts, photographs.
  • The zone. At a monument, in its protection zone or in a protected built area the deed can be a crime, with a different period and a different body investigating it.
  • The regularisation permit. Check whether the building is on the permanent list or falls within the one-year window while it is still open.
  • Who establishes the fine. The fine in article 357 can be applied by the I.S.C. and by the inspection departments of the city hall or county council. The fine in article 570 is applied by the I.S.C. or, for special-character buildings, by the authorised staff of the institutions in the defence, public order and national security system (art. 571).

The steps for putting a building that is already up in order are gathered on the page about bringing a building into legality.


This article is an analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026, from the Criminal Code (Legea 286/2009) and, for the old rule, from Legea 50/1991, now repealed. Romanian legal terms are kept in the original where no exact English equivalent exists. Check your own situation with the issuing authority.

AutoRize Team

The AutoRize team

We write about construction permitting in Romania: what has changed, what it means for your file and what to do now.

Your certificat de urbanism file, in 30 seconds

AutoRize generates the application, the memoriu de prezentare and the opis for the certificat de urbanism, matched to local planning rules.

Get started