A neighbour is putting up a house with no permit on the fence. The Urban Planning Code (Legea 169/2026) has no complaint form and does not say how to file one. It names who inspects construction discipline: the State Inspectorate in Construction (I.S.C.) and local bodies. It says what that body must do on finding works without a permit and how long the court route stays open. It does not say how long the authority has to answer; more below.
In short
| Question | Answer | Where it says so |
|---|---|---|
| Who inspects discipline in construction | The I.S.C., which exercises state control, and the local bodies: the mayor, local police in the specialised department or local control bodies; at county level, the county council president and the county chief architect | art. 351 para. (1) lit. a)-b), art. 353 para. (1) and (4), art. 354 |
| What the body does when it finds works without a permit | Orders them to stop, and conservation measures, at the developer’s expense | art. 353 para. (2)-(3), art. 354 para. (1) |
| What it orders after a fine | Bringing the works into line, regularisation or demolition | art. 358 para. (1) |
| If the offender does not comply | The body refers to the court, which sets deadlines; the mayor or the county council president carries out the work at the guilty parties’ expense | art. 358 para. (3)-(5) |
| Who can impose fines | The I.S.C., for any contravention; the local departments, for those in art. 357 para. (1) lit. a)-j) and p) and para. (2), within their administrative-territorial unit and according to their competence to issue permits | art. 357 para. (9) |
| If the local departments do not organise and carry out control | A contravention: a fine of 5,000 to 30,000 lei or, for a first offence, a warning | art. 354 para. (1) and (4), art. 357 para. (1) lit. o), para. (4) lit. i), (6) and (8) |
| An authorised site has no panel | A contravention: 2,000 lei or, for a first offence, a warning | art. 314 para. (7), art. 357 para. (1) lit. h), para. (4) lit. g), para. (6) |
| How long the court route stays open | The authorities’ action to demolish or regularise lapses 10 years after the works are finished in fact | art. 357 para. (10)-(11) |
| The work has a permit but looks unlawful | Any person may bring the matter before the administrative court under Law 554/2004; permits issued unlawfully can be annulled | art. 360 |
Whom you send the report to
For an ordinary building, the Code names two groups of control bodies: the I.S.C. and the local bodies. On our reading, a written referral, with the address, the cadastral number and what is visible from the road, can go to either of them. The Code does not say which suits better. For the I.S.C., the Code works through the county construction inspectorates, so the most direct route is the inspectorate for the county where the works are.
The I.S.C. exercises state control across the country and also oversees the work of the local authorities. The county council president and the county chief architect record and sanction contraventions within their competence, on county territory (art. 354 para. (2)).
Local bodies cannot choose not to inspect. The Code obliges them to monitor compliance. If the competent departments fail to organise and carry out control, that is itself a contravention, with the fine in the table.
Is there a form? How soon do you get an answer?
The Code has no complaint form. It sets no deadline for the authority to answer and does not oblige the body to report the result to whoever raised the matter. On our reading, your report is a petition within the meaning of Government Ordinance 27/2002 (art. 2), and the authority must send you its answer within 30 days of registration (art. 8 para. (1)). Its head can extend that period by at most 15 days (art. 9).
The words sesizare (referral), reclamație (grievance), petiție (petition), plângere (complaint) and denunț (denunciation) appear in the Code as follows:
- Sesizare: where it appears, the referral is made by control bodies, courts, users of buildings or professionals, for instance after a technical accident. Any person may refer a matter to the administrative court (art. 360).
- Reclamație: for construction products, a control may start from a referral or grievance (art. 568).
- Petiție: the only one, in art. 295 para. (9), is a petition asking for a work to be classified under an authorisation regime.
- Plângere and denunț do not appear at all.
How to check whether the work has papers
Check the public lists of the authority that issues permits. It must make the information about them public within 30 days, at its office and on its website or issuing platform (art. 314 para. (2)). The list of permits contains the number and date, the project title, the P.O.T. and C.U.T., setbacks from the property boundaries, areas and height regime (para. (5)). It also shows whether the heritage and environmental approvals were requested, the site plan and the facades.
Works tacitly approved on notification have a public list too, displayed monthly, with the notification register number, the address, the cadastral number and the notified work (para. (10)). Before work starts, the permit holder must record the permit number, date and title in the land register and publish them in a newspaper. At the same stage, the holder must put the project identification panel on site, in view. A missing panel on an authorised work is a contravention: 2,000 lei or, for a first offence, a warning.
A permit missing from the list does not automatically make a site unlawful. The article 299 works, those with no formality at all, appear on no list, and works on notification appear only if the notification was approved tacitly. The list of works that go without a permit is on the page about works without a permit. Whether a work qualifies for notification you can check in do you qualify for simplified notification. What the lists show and where to find them is in what the town hall must publish about permits.
What the body does when it finds works without a permit
The I.S.C. or the local body orders works carried out without a permit or in breach of the permit to stop (art. 353 para. (2)). It does the same for works on permits issued in breach of the law, established by final court decisions or in breach of the other procedures in the Code. Alongside the stop, conservation measures for the work already done are ordered, at the developer’s expense. The body may bar access to the site, apply seals and order disconnection from site utilities (para. (6)).
A stop is not demolition. The body that imposed the fine must order the measures needed for:
- bringing the works into line with the permit or the notified design;
- obtaining a regularisation permit, if the works comply with urban planning rules and the fundamental quality requirements;
- demolishing them, if they do not.
Demolition is also ordered for works without a permit that are still in that state after the one-year window in which regularisation can be requested (art. 301 para. (7)). Details are in the one-year window for regularisation. The control body of the local authority that issues the permit must analyse how the construction fits the urban planning documents for the area (art. 358 para. (2)).
What a stop looks like from the side of the person it targets, with costs and the route to appeal, is in your site has been stopped. The fine amounts are on the page about fines for building without a permit.
When the case goes to court
If the offender does not do what was ordered within the deadline in the record, the body refers the matter to the court to bring the works into line or demolish them. The court sets the final deadlines. If those are missed too, the measures are carried out by the mayor or the county council president, at the guilty parties’ expense.
On land of the state or of administrative-territorial units, the court route has an exception: art. 359 allows administrative demolition. On the land owner’s request, the authority has 15 calendar days to do it; otherwise the owner may do it. The 15 days run only from a request by the land’s owner or legal administrator; a referral by anyone else does not start them.
When the act may be a crime, the body orders a temporary stop and sends the case to the prosecutors (art. 358 para. (7)). How it gets there is explained in where criminal liability begins.
How long the route stays open
The authorities’ court action to demolish or regularise works done without a permit lapses 10 years after the works are finished in fact (art. 357 para. (10) and (11)). For the fines in the same article, the Code sets no period. Art. 357 para. (7) says that, for a finished construction, a period runs from the date the work was completed in fact. It points, however, to para. (5), which contains no period.
A 5-year period does exist in art. 571 para. (2), but for the fines in art. 570. Among them is the one of 50,000 to 100,000 lei for building or demolishing in breach of the provisions on authorisation (art. 570 para. (1) lit. a)), which the I.S.C. imposes. Nor does the general rule in Government Ordinance 2/2001 fill the gap, as we first wrote here. Art. 581 para. (3) excludes the ordinance from the application of the Code, with the exceptions in articles 144 and 571. We looked at the consequences in does unpermitted construction time out?.
If the work has a permit but you think it is unlawful
The route is the administrative court. The Code gives the right to bring the matter before it to any person, under Law 554/2004. Permits issued in breach of the law can be annulled by that court (art. 360).
Who has standing, which prior complaint that law requires and within which deadlines is covered in annulling a building permit. What happens to a house already built on an annulled permit we explained in the permit is annulled, the house is built.
What to expect
The Code does not promise an answer within a set time; the 30 days come from Government Ordinance 27/2002, as set out above. What it does set are the duties of the body that finds works without a permit: to stop them and, after a fine, to choose between bringing them into line, regularising them and demolishing them.
This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026, and from Government Ordinance 27/2002 on the handling of petitions. Check your own situation with the issuing authority.