If your house drains into a small treatment plant, Government Decision (HG) 714/2022 requires you to register the system with the town hall, in the register it keeps. Our reading is that the rule also covers an emptiable septic tank that only collects. For a new installation you have 120 days from connecting the house to it. For systems that already existed, the 180-day deadline ran out in November 2022. The fine for not registering is 5,000-10,000 lei, and it is not the town hall that issues it, but the National Environmental Guard and the water inspectorate.
What HG 714 requires when you register the tank
| Obligation | Who | Deadline or rule | Where it is written |
|---|---|---|---|
| Set up the register of individual systems | The town hall | 90 days from the decision’s entry into force | Criteria, art. 10(1) |
| Enter the system in the register | The owner of the connected house | 120 days from connection | art. 11(1) |
| Enter a system built before the decision | The owner | 180 days from entry into force, now expired | art. 11(2) |
| Remove the sludge through an accredited emptying firm | The owner | For every system | art. 15(1) |
| Emptying intervals appear in the register | The owner answers for them (art. 23) | For every system | art. 15(2) |
| Hold a contract with an emptying firm | The owner of a tank that only collects | The water goes to a treatment plant | art. 14(5) |
The decision was published in Monitorul Oficial no. 527 of 27 May 2022 and has a single article, which approves the Criteriile pentru autorizarea, construcția, înscrierea/înregistrarea, controlul, exploatarea și întreținerea sistemelor individuale adecvate de colectare și epurare a apelor uzate (the criteria for authorising, building, registering, inspecting, operating and maintaining individual wastewater systems). Every article cited below is from those criteria.
Which systems go in the register
Systems that treat the water, such as a small treatment plant, are clearly in; for a tank that only collects, the answer comes from two articles, read below. The decision speaks of sisteme individuale adecvate (adequate individual systems), a term it takes from the water supply and sewerage services law (Legea 241/2006, art. 3(aj)). In practice there are two families: sealed tanks that only collect the water and are emptied by a tanker, and systems that also treat it, then discharge it into the ground or a watercourse. The criteria treat them separately for authorisation (art. 4 and art. 5) and for operation (art. 14).
Article 11(1) speaks of the owner of the spaces connected la sistemul individual adecvat de epurare (to the individual treatment system), but the 120 days run from conectarea incintei la sistemul de colectare și/sau epurare a apelor uzate (connecting the premises to the collection and/or treatment system). And article 15(2) puts in the register the intervalele de vidanjare pentru bazinele de colectare (emptying intervals for collection tanks). Our reading: an emptiable tank that only collects is registered as well.
A pit without a sealed bottom does not appear in the decision. The hygiene norms separately ban spreading wastewater directly on the ground, and what that means for a tank that soaks into the soil is covered in septic tanks: the legal distance and the permit, together with the 10 m from homes and wells.
The deadlines, for a new tank and an old one
For a tank or treatment plant built now, the 120 days run from the date the house was connected to it (art. 11(1)). For one built before the decision, paragraph (2) gave 180 days from the criteria’s entry into force. The decision was published on 27 May 2022, so that deadline is long gone.
If you have not registered yours yet, the decision has no separate procedure for late registration and does not say that registering after the deadline removes the fine. Our reading is that it is worth registering now, before any inspection. The register is checked in the Environmental Guard’s inspection (art. 18(2)).
Article 11(1) says the owner registers prin grija reprezentantului unității administrativ-teritoriale (with the care of the local authority’s representative), and article 10(3) obliges the town hall to provide forms. The register can also be kept online (art. 10(2)). The form differs from one town hall to the next, so ask for it at the registry desk or look for it on your town hall’s website.
What goes in the register, and why emptying matters
Besides the system itself, article 15(2) requires the register to hold the emptying intervals for collection tanks and the sludge collection intervals for treatment systems. And article 23 fines individuals and companies who do not comply with that rule with the same 5,000-10,000 lei.
The other operating duties are in articles 12-16. Maintenance falls on the owner (art. 12). Sludge must be removed by an accredited emptying firm (art. 15(1)). For a tank that only collects, you need a contract with an emptying firm that takes the water to a treatment plant (art. 14(5)). Emptying firms have their own duties, with GPS and equipment to measure the volume on their tankers (art. 16), and their own fine of 15,000-20,000 lei (art. 24).
Keep the contract and the emptying receipts. The Environmental Guard’s inspection includes o verificare a registrului sistemelor individuale adecvate și a contractelor de vidanjare și de descărcare într-o stație de epurare (a check of the register and of the emptying and discharge contracts) (art. 18(2)).
The fines: how much and who issues them
| Offence | Fine | Where it is written |
|---|---|---|
| The town hall does not set up the register | 10,000-15,000 lei | art. 22 |
| The owner does not register the system or the emptying intervals | 5,000-10,000 lei | art. 23 |
| The emptying firm does not equip its tankers | 15,000-20,000 lei | art. 24 |
| Refusing to show the documents at the acceptance inspection | 5,000-10,000 lei | art. 25 |
The offences are recorded by staff of the National Environmental Guard and the water inspectorate of the water management authority (art. 26). The town hall keeps the register and takes part, alongside the Environmental Guard, in the inspections planned each year (art. 18(1)), but it is not among the officers who apply the fine. The sanctions came into force 30 days after publication (art. 29).
For the fines given to owners, article 27 applies Government Ordinance 2/2001. Two rules follow from that. You can pay half of the minimum fine, that is 2,500 lei, within 15 days of receiving the report (art. 28(1) of the ordinance), and a complaint must be filed within 15 days (art. 31(1)). Paragraph (1^1) has a separate rule for fines in building permits and planning: half of the fine applied, except for works without a permit or in breach of it. Our reading is that the register fine stays under the general rule.
That the ordinance applies at all is itself a difference from the fines in the planning Code, to which, as a rule, the ordinance does not apply (art. 581(3) of the Code), as explained in contesting a fine for building without a permit.
The building permit for a septic tank after Legea 50/1991
Our reading: a new septic tank is still authorised by a building permit, and the conditions are now read in the Code. The reason is a cross-reference: article 3 of the criteria says individual systems vor fi autorizate prin autorizația de construire (will be authorised by a building permit), with a reference to article 3(1) of Legea 50/1991. Legea 50/1991 was repealed by the planning Code (Legea 169/2026, art. 576(3)(b)), in force since 25 August 2026. The reference does not lapse, though: article 583(3) of the Code says that where other legal acts refer to provisions the Code repealed, the reference is deemed made to the Code.
Separately from that reading, for a new house with no public networks, the design for the building permit must show its own drainage installations (Annex 2 to the Code, point 1.5).
Two further documents appear only in some cases. A system that treats water and discharges it into the ground or a watercourse needs a water management notice and permit (art. 5(1)), and the water management permit requires the acceptance report showing that the seals were checked, plus the certificates for the tanks bought (art. 6). The acceptance of the system is attended by a representative of the town hall and one of the county environmental protection agency (art. 17(1)), alongside the usual committee described on the page about acceptance on completion of works.
When the sewer reaches your street
The rule is that individual systems are authorised where a public network is not justified for environmental or economic reasons (art. 1(1)). As an exception, they can also be authorised until a new public network enters service, and owners must then connect to it within one year (art. 1(2)). The decision does not say what happens to the register entry after connection.
The form, or the certificat de urbanism
Registering a septic tank with the town hall is done on your town hall’s own form. Record on it the type of system exactly as you have it, a tank that only collects or a plant that treats, and if the plant discharges into the ground or a stream, check the water management notice and permit as well. A tank still to be built starts elsewhere: with the certificat de urbanism, before any digging.
This article is analysis, not legal advice. The rules cited are from the Criteria approved by Government Decision 714/2022 (Monitorul Oficial no. 527 of 27 May 2022), Government Ordinance 2/2001 (consolidated form of 27 March 2026) and Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026. Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority.