A construction product needs a technical approval (agrement tehnic) when it has no standard at all and no European technical assessment. If it carries CE marking and a declaration of performance, the approval is not mandatory. The approval is valid for 3 years, only together with a valid technical opinion of the Permanent Technical Council for Construction, CTPC (Urbanism Code, Legea 169/2026). It is applied for by the manufacturer or its representative (approval regulation, art. 18(1)(a)), not by the person commissioning the works.
In short: which document the product must have
The document depends on the product’s standard. The approval is the document for the last case in the table, products with no standard and no European technical assessment.
| The product’s situation | The document that goes with it | Where it is written |
|---|---|---|
| It has a harmonised standard or a European technical assessment | The declaration of performance and CE marking, plus the body’s certificate where required | Law 169/2026, art. 563(1)(a) |
| It is lawfully sold in another EU state and has no harmonised requirement | The mutual recognition declaration, drawn up voluntarily | art. 563(1)(b) |
| It has only a non-harmonised standard | The declaration of conformity and, where relevant, the certificate of conformity | art. 563(1)(c) |
| It has no standard and no European technical assessment | The approval and the national declaration of conformity | art. 563(1)(d), art. 561(5) |
When a technical approval is mandatory
An approval is mandatory for products with no standard, harmonised or not, and no European technical assessment: the Code forbids using them without one (articles 379 and 561). The same goes for processes that differ from those in the technical regulations. An approval can also be issued for equipment. If the product carries CE marking and a declaration of performance, the approval is no longer mandatory.
A construction product with no standard can be used lawfully if it has a technical approval. The Code defines it as a favourable written technical assessment confirming that the product or process meets the fundamental requirements. It concerns you when you choose an unusual material, a new wall system or a process the technical standards do not describe, because the contractor may use only certified or approved products.
There is also an exception for tradition. Techniques and materials established in local culture and identity, or used to restore historic monuments and buildings in protected built-up areas or protected landscapes, may be used without an approval. The condition is that they are specified in the project and that their performance meets the fundamental requirements (article 379).
Technical approval or declaration of conformity
It depends on which standard the product has. A product with a non-harmonised standard needs the declaration of conformity, not the approval. A product with no standard needs the approval, together with the national declaration of conformity (article 563). The approval and the declaration of conformity cover different rows of the table. The declaration of conformity with the approval is issued by the manufacturer (annex 5 to HG 766/1997, art. 3).
All documents must be in Romanian or translated. A distributor selling the product in Romania must hold them, except the technical file. It must also pass them along the distribution chain and show them to the authorities on request (article 563). If a supplier cannot show the right document for its product, that is a reason to hold off buying.
Who draws up the approval and how long it lasts
The approval is drawn up by a body authorised by the ministry responsible for construction. It is valid for 3 years, but only together with the CTPC’s technical opinion, the aviz tehnic (articles 561 and 562).
The procedure is set out in the approval regulation, annex 5 to HG 766/1997, which stays in force (article 577). The text in force is the 2017 one, from HG 750/2017. Under the regulation, the approval is applied for by the manufacturer or its representative through the approval bodies (art. 18(1)(a)). The holder of the approval is the applicant (art. 3).
On validity, the Code and the regulation do not say the same thing:
| Urbanism Code | 2017 regulation | |
|---|---|---|
| The approval | 3 years (art. 562(1)) | 3 years (art. 7(1)) |
| CTPC technical opinion | 3 years (art. 562(3)) | 2 years, extendable by 1 year up to the approval’s expiry (art. 12) |
Our reading is that for the technical opinion the Code’s 3 years apply, since the Code is a law and is newer than the regulation. The Code does still keep the extension of the technical opinion among the CTPC’s tasks (article 565). In practice, what counts is the validity date printed on the opinion. The regulation also refers to the lists of valid approvals published on the ministry’s website (art. 17).
Who checks the approval along the way
Several participants have duties tied to the approval, so a gap can surface before the reception: the project checker, the contractor and the State Construction Inspectorate (ISC).
For buildings in consequence class CC2, the project checker checks at level 2 and also looks at whether the project can be built with existing and approved materials (article 442). The contractor uses only the products and processes in the project, certified or approved. It may replace them only with others that meet the same conditions, on the designer’s solution and with the client’s consent (article 452). The ISC checks, among other things, the approval of products, processes and equipment (article 466).
When a project checker is required is covered in the project checker. What the project filed for the permit contains is on the page about the PAC.
What you risk with a product that has no approval
Specifying in a project, or using, uncertified products or products without an approval, on works that must meet the fundamental requirements, is a contravention. The fine is 10,000 to 20,000 lei, with no warning (article 570). The text does not say who exactly is fined, the designer or whoever installs the product, so we do not assume.
The holder of the approval must give a copy of the approval, with the valid technical opinion and the manufacturer’s declaration of conformity, to those who ask for it: designers, contractors, distributors, users, project checkers and technical experts (the regulation, art. 21). If you are the user of the product, you can ask for the documents too. What to ask of the contractor in the contract is set out in the construction contract for a house.
What to check when buying
- Ask what the product has: a harmonised standard or European technical assessment, a non-harmonised standard, or none.
- Ask for the matching document from the first table, in Romanian.
- For an approved product, check the date on the CTPC technical opinion, not only on the approval.
- If the product replaces one in the project, ask for the designer’s written solution and give your consent.
This article is analysis, not legal advice. The provisions cited are from Legea 169/2026, published in Monitorul Oficial no. 661 of 10 August 2026, and from the regulation on technical approval in construction (annex 5 to HG 766/1997, as worded by HG 750/2017). Romanian legal terms are kept in the original where the English would be misleading. Check your own situation with the issuing authority.