What paperwork you need, in the order you get it
You do not need to learn the legislation. You need to know what comes after each step, and who does it.
Most permit problems do not come from bad intent, they come from taking the steps in the wrong order. People apply for the building permit before the urbanism certificate, or start work believing they do not need paperwork at all. The real order is simple: first the urbanism certificate, which tells you what you are allowed to build and which approvals you need, then the approvals, then the building permit.
What kind of project do you have
- New houseBuilding from scratch, on a plot you have not built on before.
- Loft conversionFor a single-family home outside protected built-up areas and monument protection zones, converting the existing attic into living space can be done through a simplified notification, as long as the building's volume is not changed and no structural reinforcement is needed. If you raise the roof by more than 0.50 m to gain volume, you need a permit.
- ExtensionEnlarging an existing building usually needs a building permit. The exception: extending rooms to fit a bathroom or a technical room of up to 25 sqm, outside protected areas, can be done through a simplified notification.
- OutbuildingIn rural areas, small outbuildings can be built with no formalities or through a notification, if they meet cumulative conditions on size, height and construction method. See what the limits are.
- FencingOutside protected areas, building a new fence by removing the existing one is done through a simplified notification, as long as it meets the area's urban planning rules. Repairs need no formalities only if the shape and materials stay the same.
- DemolitionTearing down an existing building. For outbuildings outside protected areas, a simplified notification is enough.
Step 1: the urbanism certificate
The urbanism certificate does not give you the right to build. It tells you what you can build on your land, under which limits, and which approvals you need next. It is requested at the town hall, with a standard form and the plot plans.
Step 2: the approvals
The certificate lists the approvals your project needs. You can obtain them directly, each from its own institution with its own set of documents and number of copies, or, if you choose, as a single acord unic from the Comisia de acord unic (art. 269(1)); a few, such as the environmental and water-management approvals, are always obtained separately. This is usually where the most time gets lost, because the list differs case by case.
Step 3: the building permit
With the approvals obtained and the project drawn up by an architect, the building permit application is filed, together with the technical documentation. Work can start once the permit is issued, not before.
What you do yourself, and what an architect does
You can file the urbanism certificate request yourself. The technical documentation for the building permit, however, must be drawn up by a licensed designer. AutoRize prepares the paperwork, it does not replace the designer.
What happens if you start without a permit
Work carried out without a permit is sanctioned and, in many cases, has to be legalised afterwards, which costs more than getting the permit from the start. Some work is exempt, but the list is shorter than people assume.
How AutoRize helps
- Generates the urbanism certificate request, filled in with your plot data.
- Shows you the avize required by the certificat de urbanism, with what each institution asks for.
- Prepares the memoriu and the requests in editable format, ready to file.
- Keeps your project paperwork in one place as you move from one stage to the next.
Frequently asked questions
Can I apply for the building permit directly, without an urbanism certificate?
No. The urbanism certificate is the first document, and it determines which approvals you need. Without it, nobody knows which documents must accompany the permit application.
Who draws up the technical documentation for the permit?
You can file the urbanism certificate request yourself. The technical documentation for the building permit, however, must be signed by a licensed designer.
I have already built without a permit. What now?
There is a legalisation procedure, but it depends on the case and can involve sanctions. Read the AutoRize guide on legalisation before drawing a conclusion about your situation.
How long does the whole process take, from certificate to permit?
The Code sets a deadline for each step: the urbanism certificate within at most 15 working days (art. 257(4)), each aviz obtained directly within at most 15 days of filing, with four exceptions (art. 269(9)), or 30 calendar days through the Comisia de acord unic (art. 269(3)), and the permit within at most 30 calendar days of filing the complete documentation (art. 273(1)). Design time and any requests for additions come on top, so the total depends on how many avize you need.
How do I know which approvals I need?
The urbanism certificate lists them for your plot and your project. Until you get it, AutoRize shows you general guidance for your type of work.