Guides to authorising construction works
From the urbanism certificate through to the reception of works, explained step by step, with the official forms ready to download.
This is everything we have written about authorising construction works in Romania: which documents each stage needs, how the official forms are filled in, who signs them, and which fees and deadlines apply. Each guide rests on official sources, and where the law leaves room for interpretation we say so rather than inventing a rule.
Funkciók
- Urbanisztikai bizonyítványA certificat de urbanism shows what may be built on a plot. See the documents needed, the fee, the 15-working-day deadline and how long it stays valid.
- Urbanisztikai bizonyítvány iránti kérelem (F_CU_04)Download the blank F_CU_04 form, which replaces F.1, free in Word or PDF, and see how the urbanism certificate request is filled in.
- Tájékoztató célú urbanisztikai bizonyítványThe urbanism certificate for information shows what can be built on a plot before you buy or design. See what it contains, what it costs and how to request it.
- Műszaki leírásGenerate the memoriu tehnic for your permit dossier straight from your project data, with AI help. Free account, no card; you pay only for the final dossier.
- Szükséges véleményezésekThe certificat de urbanism tells you which avize you need. See who issues them and by when, then generate the cereri de avize and the opis with AutoRize.
- PAC dokumentációPAC is the project for authorising construction, formerly DTAC. See what it contains, who signs it and how to prepare your dossier with AutoRize.
- Építési engedély iránti kérelem (F_A_01)Download the blank F_A_01 form, which replaces F.8, in Word or PDF, and see how to fill in and file the building permit request (Order no. 975/2026).
Útmutatók
- Építési engedélyThe building permit (autorizație de construire) step by step: the certificat de urbanism, approvals, PAC, the file, the 30-day deadline, the 0.5%/1% base fee.
- Engedélyezési illetékEstimate the Romanian building permit base fee: 0.5% for residential buildings, 1% for other constructions, under the Fiscal Code. Plus the other fees.
- Tereprendezés és telekmunkálatokWhen you need a permit for landscaping and site works: green spaces, campsites, boreholes, site organisation. The landscaping project, explained simply.
- Engedély meghosszabbításaA building permit's execution period can be extended once, by up to 12 months, for a 30% fee. The 3-year deadline to start the works cannot be extended.
- PUG, PUZ és PUDWhat PUG, PUZ and PUD are, what each regulates and when you need a PUZ or PUD. PUD now stands for a detail urban "project", not "plan".
- POT, CUT és UTRUTR = reference territorial unit. What POT, CUT and UTR mean, how each is calculated with an example, and how a PUZ or a PUD can change them.
- JogszerűsítésWhat legalising a building means when it was put up without a permit in Romania, the risks involved, the steps it takes and why it is never guaranteed.
- Utólagos rendezési engedély (regularizare)Who can obtain an autorizație de regularizare, the cumulative conditions, the one-year window with fees ten times higher, and what happens after the deadline.
- Műszaki átvétel a munkálatok befejezésekorWho calls the reception at completion of works, what you sign, when the final reception follows the warranty, and why the HG 273/1994 rules still apply.
- Engedély nélküli munkálatokWhich works can be carried out without a building permit and which need one: fence, garage, pool, annexes, repairs and demolition, explained briefly.
- Bontási engedélyNeed a permit to demolish? See when it is mandatory, what the PAD contains, the F_A_01 form and when you can demolish an annex by notification.
- ISU tűzvédelmi véleményezésWhat ISU does in the authorisation process, what deadlines the fire safety aviz has, and which fire-prevention works can be done without a permit.
- Engedély BukarestbenBuilding permit in Bucharest: the steps, the approvals and the PAC file, with documents on the official forms and the issuer checked before you file.
- Engedély KolozsváronBuilding permit in Cluj-Napoca: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free.
- Engedély JászvásáronBuilding permit in Iași: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély KonstancánBuilding permit in Constanța: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély TemesváronBuilding permit in Timișoara: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély BrassóbanBuilding permit in Brașov: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély CraiovánBuilding permit in Craiova: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély GalaconBuilding permit in Galați: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély NagyváradonBuilding permit in Oradea: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély PloieștibenBuilding permit in Ploiești: the urbanism certificate, the approvals and the PAC file, with documents generated on the official forms. Start free, no card.
- Engedély MarosvásárhelyenBuilding permit in Târgu Mureș: certificat de urbanism, avize and the PAC dossier, with documents generated by AutoRize on the official forms.
- Egyszerűsített bejelentés (notificare)The middle regime in the Codul urbanismului: loft conversions in houses, new fences and small rural annexes. 15 working days to reply, or tacit approval.
- Egységes Véleményezési BizottságThe Single Approval Commission can, if you choose it, gather most avize from one filing in 30 days. See what it covers, where it exists and what to do now.
- 169/2026-os törvényDownload Legea 169/2026 free as a PDF, as published in Monitorul Oficial no. 661. Plus what is repealed, what stays valid and which deadlines run now.
- 50/1991-es törvényLaw 50/1991 was repealed on 25 August 2026 and replaced by the Urbanism Code. What took over each rule, and which law applies to a file opened before that date.
- Bírságok és szankciókUrbanism Code fines: 50,000-1,000,000 lei for building without a permit, and 50,000-500,000 lei per storey above the authorised height regime.
- Országos egyablakos ügyintézés (Ghișeul unic)The Ghișeul unic național is not yet how you file: it is being introduced in stages over 5 years. See where you file today and what comes next.
Blog
How AutoRize helps
- Generates the requests on the F_CU_04 and F_A_01 forms, the memoriu and the index, in Word and PDF.
- AI auto-fill from the urbanism certificate or the land registry extract.
- A list of avize with the issuer, fee and required documents for each one.
- Official fees and deadlines in one place, with reminders for the important dates.
Frequently asked questions
Where do I start?
With the urbanism certificate. It tells you what can be built on the land and which avize you will need, so it sets up everything that follows.
Does AutoRize replace the architect or designer?
No. The technical documentation is prepared and signed by licensed specialists. AutoRize generates the administrative documents and guides you through the process.
Are these guides legal advice?
No. They are informational materials based on the legislation in force. For your specific situation, check with the issuing town hall and, where needed, a specialist.
Hasznos oldalak ugyanahhoz a dossziéhoz
Start with the first document
Free plan, no card. Generate the urbanism certificate request completed with your project data.